Run Date: 08/05/2011 16:36:29 <br />Contractor: BABB CONSTRUCTION <br />Job #: 93- 004546 <br />Contract No: 2009 -00030 <br />PO #: 2010100033 <br />Assessable: Yes <br />Line <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 024 <br />Original Contract: $2,120,407.20 <br />Current Amount: $2,291,550.34 <br />Contract Award Date: 07/02/2009 <br />Completion Date: 10/20/2010 <br />Current Contract <br />Description Last Chng Ord Unit Price Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity <br />Page 9 <br />% Complete <br />1036 <br />COMPLETE DRIVEWAY @ 3484 STORE <br />017 <br />$6,146.09 <br />LUMPSUM <br />1.000 <br />$6,146.09 <br />0.000 <br />$0.00 <br />1.000 <br />$6,146.09 <br />100.00 <br />1037 <br />ADDITIONAL GRADING ON MISC DRI <br />018 <br />$742.71 <br />LUMPSUM <br />1.000 <br />$742.71 <br />0.000 <br />$0.00 <br />1.000 <br />$742.71 <br />100.00 <br />1040 <br />CONCRETE WALKS, 4" THICK <br />$3.12 <br />SQFT <br />26,808.000 <br />$83,640.96 <br />0.000 <br />$0.00 <br />26,053.700 <br />$81,287.54 <br />97.00 <br />1050 <br />CONCRETE WALK, 5" THICK <br />$3.55 <br />SQFT <br />4,163.000 <br />$14,778.65 <br />0.000 <br />$0.00 <br />4,803.400 <br />$17,052.07 <br />115.00 <br />1051 <br />PLACE PCC ADJ TO VALLEY GUTTER <br />013 <br />$1,704.89 <br />LUMPSUM <br />1.000 <br />$1,704.89 <br />0.000 <br />$0.00 <br />1.000 <br />$1,704.89 <br />100.00 <br />1052 <br />PCC PAVEMENT FOR MAILBOX PULL <br />015 <br />$647.47 <br />LUMPSUM <br />1.000 <br />$647.47 <br />0.000 <br />$0.00 <br />1.000 <br />$647.47 <br />100.00 <br />1060 <br />ADA TEXTURING <br />$16.00 <br />SQFT <br />262.000 <br />$4,192.00 <br />0.000 <br />$0.00 <br />248.000 <br />$3,968.00 <br />95.00 <br />1070 <br />PAINT MEDIAN /TRAFFIC CIRCLE CU <br />$15.20 <br />FOOT <br />46.000 <br />$699.20 <br />0.000 <br />$0.00 <br />273.000 <br />$4,149.60 <br />593.00 <br />1080 <br />PVMT LEGEND, TYPE A -2: SPEED T <br />$225.00 <br />EACH <br />32.000 <br />$7,200.00 <br />0.000 <br />$0.00 <br />32.000 <br />$7,200.00 <br />100.00 <br />1090 <br />PVMT LINE, TYPE A -2 <br />$8.00 <br />SQFT <br />201.000 <br />$1,608.00 <br />0.000 <br />$0.00 <br />255.000 <br />$2,040.00 <br />127.00 <br />1100 <br />BI- DIRECTIONAL YELLOW TYPE I M <br />$5.50 <br />EACH <br />35.000 <br />$192.50 <br />0.000 <br />$0.00 <br />32.000 <br />$176.00 <br />91.00 <br />1110 <br />THERMOPLASTIC, NON - PROFILE, 90 <br />$1,896.00 <br />LUMPSUM <br />1.000 <br />$1,896.00 <br />0.000 <br />$0.00 <br />1.000 <br />$1,896.00 <br />100.00 <br />1120 <br />REMOVE AND REINSTALL GUARDRAIL <br />$60.00 <br />FOOT <br />50.000 <br />$3,000.00 <br />0.000 <br />$0.00 <br />90.000 <br />$5,400.00 <br />180.00 <br />1130 <br />REMOVE AND REINSTALL EXISTING <br />$7,125.00 <br />LUMPSUM <br />1.000 <br />$7,125.00 <br />0.000 <br />$0.00 <br />1.000 <br />$7,125.00 <br />100.00 <br />1140 <br />SIGNS IN PLACE <br />$3,150.00 <br />LUMPSUM <br />1.000 <br />$3,150.00 <br />0.000 <br />$0.00 <br />1.000 <br />$3,150.00 <br />100.00 <br />1141 <br />SUPPLY 17 SIGN POSTS THROUGHOU <br />018 <br />$359.49 <br />LUMPSUM <br />1.000 <br />$359.49 <br />0.000 <br />$0.00 <br />1.000 <br />$359.49 <br />100.00 <br />1150 <br />SPEED TABLES /RAISED CROSSING <br />$5.10 <br />SQFT <br />7,087.000 <br />$36,143.70 <br />0.000 <br />$0.00 <br />7,364 600 <br />$37,559.46 <br />104.00 <br />1151 <br />REM HALF OF SPEED TABLE @ -19+ <br />020 <br />$755.59 <br />LUMPSUM <br />1.000 <br />$755.59 <br />0.000 <br />$0.00 <br />1.000 <br />$755.59 <br />100.00 <br />1160 <br />ILLUMINATION <br />$2,000.00 <br />LUMPSUM <br />1.000 <br />$2,000.00 <br />0.000 <br />$0.00 <br />1.000 <br />$2,000.00 <br />100.00 <br />1161 <br />INSTALL PERM TRAFFIC CONTROL ( <br />019 <br />$8,941.59 <br />LUMPSUM <br />1.000 <br />$8,941.59 <br />0.000 <br />$0.00 <br />1.000 <br />$8,941.59 <br />100.00 <br />1162 <br />INSTALL ADDITIONAL SIGNAL LOOP <br />022 <br />$3,613.50 <br />EACH <br />1.000 <br />$3,613.50 <br />0.000 <br />$0.00 <br />1.000 <br />$3,613.50 <br />100.00 <br />1170 <br />IRRIGATION SYSTEM <br />$500.00 <br />LUMPSUM <br />1.000 <br />$500.00 <br />0.000 <br />$0.00 <br />0.950 <br />$475.00 <br />95.00 <br />1180 <br />TOPSOIL <br />$20.00 <br />TON <br />1,500.000 <br />$30,000.00 <br />0.000 <br />$0.00 <br />1,316 740 <br />$26,334.80 <br />88.00 <br />1190 <br />MEDIANS - SOIL PREPARATION <br />$0.08 <br />SQFT <br />645.000 <br />$51.60 <br />0.000 <br />$0.00 <br />645.000 <br />$51.60 <br />100.00 <br />1200 <br />MEDIANS - TREES <br />$195.50 <br />EACH <br />6.000 <br />$1,173.00 <br />0.000 <br />$0.00 <br />6.000 <br />$1,173.00 <br />100.00 <br />1210 <br />MEDIANS - SHRUBS (30 ") <br />$3 0.00 <br />EACH <br />6.000 <br />$180.00 <br />0.000 <br />$0.00 <br />6.000 <br />$180.00 <br />100.00 <br />Amount <br />