New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Traffic Shifts to Donald as First Phase of Willamette Repairs Finished
COE
>
PW
>
Admin
>
Public Affairs
>
2011
>
Traffic Shifts to Donald as First Phase of Willamette Repairs Finished
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2011 4:45:42 PM
Creation date
8/9/2011 4:45:36 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
8/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />August 9, 2011 <br /> <br />CONTACT: <br />David Starns, Public Works Engineering Project Manager, 541-682-8306 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br />FOR IMMEDIATE RELEASE <br /> <br />Traffic Shifts to Donald as First Phase of Willamette Repairs Finished <br />thth <br />The first phase of a $1.5 million project to repair Willamette Street from 29 to 46 avenues <br />has been substantially completed, and northbound traffic has been shifted onto Donald Street as <br />the next phase begins. <br />th <br />The section of Willamette Street between 29 Avenue and Crest Drive is scheduled to be <br />reopened to two-way traffic this evening. Willamette Street will be closed to northbound traffic <br />between 46th Avenue and Crest Drive. Northbound traffic on Willamette Street will be detoured at <br />th <br />46 Avenue to Donald Street. Northbound through traffic can take Donald Street to its intersection <br />nd <br />at Willamette Street at 32 Avenue and then continue north on Willamette Street. <br />One lane of Willamette Street remains open for southbound traffic between Crest Drive and <br />th <br />46 Avenue, although motorists may encounter occasional brief delays. All streets east of <br />thth <br />Willamette between Crest Drive and 46 Avenue except 40 Avenue are closed at Willamette. On <br />thth <br />the west side of Willamette Street, 35 and 36 avenues are closed at Willamette; use Crest Drive <br />thth <br />or 37 Avenue to Willamette Street southbound to 40 Avenue to Donald Street to go north. <br />During the first phase of repairs, crews from Wildish Construction reconstructed Willamette <br />th <br />Street between 29 Avenue and Crest Drive. In the next phase of construction, crews will use in- <br />place recycling techniques to repair the roadway. <br />All work is scheduled to be completed by late September. <br />Updates on this project and other road-repair projects in the metro area are available at <br />www.keepusmoving.info <br /># # # <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />
The URL can be used to link to this page
Your browser does not support the video tag.