New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 004651 Inv 11044 Pavement Services
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2012
>
GJN 004651 Inv 11044 Pavement Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 9:20:14 AM
Creation date
8/3/2011 11:58:51 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
004651
004716
Identification_Number
2012002140
COE_Contract_Number
2009-00225
Document_Number
11044
Text box
ID:
1
Creator:
CEDOM100\CEWACLM
Created:
8/3/2011 1:34 PM
Modified:
8/3/2011 3:42 PM
Text:
DO: 2012002140 R: 306460
ID:
2
Creator:
CEDOM100\CEWATDS
Created:
8/3/2011 1:52 PM
Modified:
8/3/2011 1:52 PM
Text:
Approved 8/3/11 PWAtds
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT SERVICES, INC <br />No purchase order for this invoice. <br />CONSUL17NG ENGINEERS FOR PAVEMEN73 <br />S41 N.E. 2e AVENUE, SUITE 107 <br />PORTLAND, OREGON 97232 -2862 <br />503235.0377 • FAX 503.235.2885 <br />PSI@PSIPDX.COM <br />Federal TIN: 93-0892845 <br />July 11, 2011 <br />Invoice No. 11044 <br />Project No. 138.01508 <br />Contract #2009 -00225 <br />City of Eugene <br />ATTN: ACCOUNTS <br />99 E Broadway, Suite 400 <br />Eugene, OR 97401 <br />Contact: Paul Klope, PE <br />INVOICE <br />Project 2011 Miscellaneous Services <br />Description: Engineering design and review as requested <br />Route Date . - - <br />To: <br />Job No. y2 2an 9j 00225 7/b <br />Conti No. <br />Assessable? DIES or N O <br />v a pw � &Z_ <br />Professional Services: Hrs/Rate Amount <br />Principal 4.25 hrs 156.00/hr 663.00 <br />Project Engineer 5.0 hrs 90: 115.00/hr 575.00 <br />Subtotal - Professional Services 925 $1,238.00 <br />TOTAL AMOUNT OF THIS BILL <br />PROGRESS INVOICE - June Way 1 through July 2, 2011 <br />Services during period consisted of review of submittal for substitution of Synteen SF11 or SF12 in lieu of <br />Twat TX160 geogrid on Alder St project per 80/2011 &mail to John Bonham; review of Eugene Sand <br />& Gravel PCC mix designs # 60- 323365 and 58- 323365 per 6/23/2011 memo to Lisa Jeff yes; review of <br />Eugene Sand 8 Gravel PCC mbc designs # 58/60-396850 and 58JSO- 309065 per 6127/2011 memo to <br />Lisa Jeffryes and review of Knife River PCC mix design # 081- 30135KOSR per 6/2812011 memo to Lisa <br />Jeffreys. <br />JUL 14 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.