Public Works <br />Engineering <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541)682=5291 <br />(541) 682-8410 FAX <br />May 3, 2010 <br />Mr. Peter Dettmer <br />90834 Coburghills Dr. <br />Eugene, OR 97408 <br />Re: Hawkins Lane Wastewater Connection <br />Construction Costs Reimbursement Agreement <br />Mr. Dettmer, <br />As you know, the City of Eugene ("City") intends to undertake .a pavement preservation project for <br />Hawkins Lane. Prior to that pavement preservation project, the City will, as part of the "2010 PPP Storm <br />Rehabilitation Project", construct a wastewater connection in Hawkins Lane at 2638 Hawkins Lane. The <br />wastewater improvements will include construction of a wastewater manhole (#19231), 8" PVC waste <br />water line, and associated curb and gutter removal and replacement (hereinafter collectively referred to <br />as "the 2638 Hawkins Lane Wastewater Improvements"). The 2638 Hawkins Lane Wastewater <br />Improvements will serve your approved 11-lot residential development "St John's Wood." Since the <br />cutting of street surfaces to install utilities is prohibited for a period of five years from the time that a <br />street is resurfaced, construction of the 2638 Hawkins Lane Wastewater Improvements as part of the <br />2010 PPP Storm Rehabilitation Project (and prior to the pavement preservation project) will provide for <br />the orderly extension of public utilities needed to serve St. John's Wood, while minimizing the need for <br />your development to disturb new pavement. <br />Based on extra work negotiations with the Contractor for the 2010 PPP Storm Rehabilitation Project, <br />Eugene Sand Construction, the City estimates that it will incur the-following costs to construct the 2638 <br />Hawkins Lane Wastewater Improvements: <br />2638 Hawkins Lane Wastewater Improvements <br />Description I <br />Quantity <br />Unit <br />Price <br />Total <br />Mobilization <br />1 <br />LS <br />$400.00 <br />$400.00 <br />Temporary Traffic Control, set up/take down <br />1 <br />LS <br />$900.00 <br />$900.00 <br />Erosion Control <br />1 <br />LS <br />$200.00 <br />$200.00 <br />8" PVC Wastewater Pipe <br />40 <br />FOOT <br />$312.50 <br />$12,500.00 <br />Sanitary Manhole over Existing Pipe <br />1 <br />EA <br />$2,500.00 <br />$2,500.00 <br />Level 3,'/z" Dense HMAC <br />10 <br />TON <br />$130.00 <br />$1,300.00 <br />Concrete Curb & Gutter <br />10 <br />FOOT <br />$34.00 <br />$340.00 <br />Flaggers <br />50 <br />HOUR <br />$43.50 <br />$2,175.00 <br />Total $20,315.00 <br />gAPr0jects\pro1-4\4674 ppp 2010 storm rehab\contract\other agreements\4674-20100429-st john's wood.docPage 1 Of 3 <br />