New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4674 First Leed PWA-000363
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2012
>
GJN4674 First Leed PWA-000363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:51:21 PM
Creation date
8/1/2011 2:47:45 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004674
GL_Project_Number
905196
Identification_Number
PWA-000363
Retention_Destruction_Date
5/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order Request <br />Date: 41212010 <br />Project: 2010 PPP Storm Rehabilitation Job No: 430529 <br />Eugene Sand CO 3 <br />General Contractor: Eugene Sand- Construction <br />The work covered by this change order shall be performed under the same terms and <br />conditions as included in the original signed contract. <br />Scope of Change: <br />740 E. 13th. Ave. Stone Drain addtion. <br />Description <br />Quantib <br />Unit <br />/Unit <br />Total <br />$0.00 <br />Removal of Catch Basin <br />1 <br />ea <br />$300.000 <br />$300.00 <br />Concrete Curb & Gutter <br />llp KS <br />if <br />$34.000 <br />$340.00 <br />Catch Basin with Bike Proof Grate <br />✓ 1 <br />ea <br />$1,000.000 <br />$1,000.00 <br />Connection to Existing Manhole <br />1 <br />ea <br />$450.000 <br />$450.00 <br />12" PVC Storm Pipe <br />10 <br />If <br />$155.000 <br />$1,550.00 <br />Level 3, 1/2" Dense HMAC <br />✓ 3 <br />ton <br />$130.000 <br />.$390.00 <br />ADDED: Mobilization, 3 mhr. to move job location <br />1 <br />Is <br />$176.00 <br />$176.00 <br />ADDED: Temporary traffic control, set up/remove <br />1 <br />Is <br />$180.00 <br />$180.00 <br />closure <br />$0.00 <br />Subtotal <br />$4,386.00 <br />OH&P <br />Included in above unit prices <br />Total Amount due this Change Order <br />$4,386.00 <br />Increased unit price from $110Af to $155Af. Original contract bid item was based on 461f in one location <br />Prorating this bid item to this 101f change order would only have allowed us 2 hr to install this pipe. The <br />additional amount is based on adding 4.5 m-hrs and 2 truck hours. <br />Changes approved by: <br />Date: <br />Eugene Sand Construction Date: <br />