2G <br />CONSTRUCTION <br />18-Jul-1 1 <br />City of Eugene <br />1820 Roosevelt Blvd <br />Eugene, OR 97402 <br />RE: Sidewalk Repairs <br />Contract #2010 -00409 <br />ATTN: Accounts Payable <br />541/689 -3850 <br />FAX 541/689-3915 <br />CCB #40559 <br />GENERAL CONTRACTORS <br />CONTRACT PROJECT <br />MANAGEMENT <br />11 <br />Total Amount Due: <br />Submitted By: <br />O a0d�(9 . <br />Duane Strickland <br />Project Manager <br />3,808.00 <br />7/_1 ��/-2 0 <br />� J J Z5 G i <br />1719 IRVING ROAD <br />EUGENE, OR 97402 <br />P.O. BOX 11735 <br />EUGENE, OR 97440 <br />PO: <br />REC: <br />TO MP: <br />Work Order No. 2011004 <br />Account No. 20110110 <br />Address 631 e 19th <br />Taxlot No. 1803052204000 <br />Description of Work Completed: <br />Unit Price Qty <br />Amount <br />Due <br />4" 3000# Concrete Sidewalk Complete <br />10.73 <br />X <br />0.00 <br />5" 3000# Concrete Sidewalk Complete <br />12.32 <br />X <br />0.00 <br />T' 4350# Concrete Sidewalk Complete <br />14.90 <br />X <br />0.00 <br />4" 3000# Concrete Sidewalk <br />7.36 <br />70.0 X 5.0 <br />2,576.00 <br />5" 3000# Concrete Sidewalk <br />8.67 <br />X <br />0.00 <br />T' 4350# Concrete Sidewalk <br />9.59 <br />X <br />0.00 <br />1" Crushed Rock 3/4" - 0" in place <br />1.75 <br />X <br />0.00 <br />Tree Protection <br />2.50 <br />X <br />0.00 <br />Curb and Gutter <br />20.80 <br />X <br />0.00 <br />Saw Cutting <br />0.55 <br />X <br />0.00 <br />4" Concrete Excavation <br />3.52 <br />70.0 X 5.0 <br />1,232.00 <br />5" Concrete Excavation <br />4.50 <br />X <br />0.00 <br />T' Concrete Excavation <br />5.85 <br />X <br />0.00 <br />Concrete Grinding <br />8.00 <br />X <br />0.00 <br />OTHER: <br />LS <br />0.00 <br />Total Amount Due: <br />Submitted By: <br />O a0d�(9 . <br />Duane Strickland <br />Project Manager <br />3,808.00 <br />7/_1 ��/-2 0 <br />� J J Z5 G i <br />1719 IRVING ROAD <br />EUGENE, OR 97402 <br />P.O. BOX 11735 <br />EUGENE, OR 97440 <br />PO: <br />REC: <br />TO MP: <br />