New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 004651 Inv 3584 LCPW
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2012
>
GJN 004651 Inv 3584 LCPW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 9:20:33 AM
Creation date
7/8/2011 10:41:29 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
004651
004716
GL_Project_Number
995484
915174
Identification_Number
2012000877
Document_Number
3584
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lane County <br />Report ID: LBILL001 BILLABLE PROJECT COSTS Page No. 1 <br />Run Date 06/21/2011 <br />Run Time 14:26:15 <br />Billable Project Costs for Fiscal Period 2011 -05 Period begins 05/01/2011 and ends including 05/31/2011 <br />Project: 36644609 AC Mix Verifi Billable HOLD Overhead Rates Applied for this project: Operational (Where applicable) <br />Billed By: 3636213 Materials Testine Proi: 36644609 <br />P4135 -Mix design <br />TranDate <br />TranlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />04/18/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />ESC ROCK PREP <br />04/18/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />04/19/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />04/20/2011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$79.38 <br />$129.64 <br />ESC ROCK PREP <br />04/20/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />04/21/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />ESC ROCK PREP <br />04/21/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$3779 <br />MIX DESIGN <br />04/21/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISHDESIGNS <br />04/25/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$3779 <br />MIX DESIGN <br />04/25/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD 3/8 <br />04/25/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISH DESIGNS - <br />04/26/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />04/26/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />PROCESSING ESC ROCK <br />04/26/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD 3/8 -- <br />04/27/2011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />04/27/2011 <br />LABOR <br />Engineering Technician 2 <br />5 <br />$132.30 <br />$216.07 <br />PROCESSING ESC ROCK <br />04/27/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD 3/8 --.. <br />04/2812011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$37.79 <br />MIX DESIGN <br />04/28/2011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$172.86 <br />PROCESSING ESC ROCK <br />04/28/2011 <br />LABOR <br />Engineering Technician <br />4 <br />$105.00 <br />$171.49 <br />WILD 3/8 � <br />04/28/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISH DESIGNS <br />04/29/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />04/29/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$52.92 <br />$86.43 <br />PROCESSING ESC ROCK <br />04/29/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD 3/8 -j- <br />04/29/2011 <br />LABOR <br />Sr Engineering Associate <br />2.5 <br />$75.85 <br />$123.88 <br />WILDISH DESIGNS <br />05/02/2011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$79.38 <br />$129.64 <br />ESC ROCK PROCESSING <br />05/02/2011 <br />LABOR <br />Engineering Technician <br />4 <br />$105.00 <br />$171.49 <br />WILD L3D - <br />05/02/2011 <br />LABOR <br />Sr Engineering Associate <br />4 <br />$121.36 <br />$198.21 <br />WILDISH DESIGNS <br />05/03/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$52.92 <br />$86.43 <br />ESC ROCK PROCESSING <br />05/03/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L3 D <br />05/04/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />WILD L3 D <br />05/10/2011 <br />LABOR <br />Supervising Engineering Assoc <br />1.5 <br />$53.73 <br />$8775 <br />WILDISH L3 3/8 <br />05/11/2011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$69.42 <br />$113.38 <br />MIX DESIGN <br />05/11/2011 <br />LABOR <br />Supervising Engineering Assoc <br />1 <br />$35.82 <br />$58.50 <br />WILDISH L3 3/8 <br />05/12/2011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />MIX DESIGN <br />05/12/2011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$105.00 <br />$171.49 <br />ESC L3 C <br />05/12/2011 <br />LABOR <br />Sr Engineering Associate <br />2.5 <br />$75.85 <br />$123.88 <br />ESC DESIGNS <br />05/13/2011 <br />LABOR <br />Engineering Technician 3 <br />I <br />$26.25 <br />$42.87 <br />ESC L3 C <br />P4135 Totals <br />$ 2865.30 <br />$ 4679.64 <br />$ 7544.94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.