Run Date: 07/05/2011 11:02:29 <br />City of Eugene Page 3 <br />Contract Preliminary Progress Payment <br />Payment No : 001 <br />Contractor: WILDISH CONSTRUCTION Original Contract: $1,533,794.50 <br />Job : 93- 004682 Current Amount: $1,533,794.50 <br />Contract No: 2011 -00015 Contract Award Date: 06/03/2011 <br />Assessable: No <br />PO : 2011100427 Completion Date: 11/01/2011 <br />Line <br />Description Last Chng Or <br />Unit Price <br />Unit <br />Current Contract <br />Estimated Payment <br />Cumulative Totals <br />% Complete <br />Measure <br />Quantity <br />Amount <br />Quantity <br />Amount <br />Quantity <br />Amount <br />0250 <br />MH FRAME /COVER - WW <br />$350.00 <br />EACH <br />3.000 <br />$1,050.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0260 <br />10 " STORM DRAIN PIPE <br />$50.00 <br />FT <br />163.000 <br />$8,150.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0270 <br />10" STORM DRAIN PIPE, C900 <br />$50.00 <br />FT <br />182.000 <br />$9,100.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0280 <br />12" STORM DRAIN PIPE <br />$100.00 <br />FT <br />38.000 <br />$3,800.00- <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0290 <br />CONNECT TO EXST PIPE <br />$250.00 <br />EACH <br />9.000 <br />$2,250.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0300 <br />CONNECTION TO EXISTING STRUCTU <br />$500.00 <br />EACH <br />10.000 <br />$5,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0310 <br />INSTALL CONCRETE INLET, 4A <br />$1,500.00 <br />EACH <br />14.000 <br />$21,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0320 <br />CONCRETE CB WITH BIKE PROOF GR <br />$1,200.00 <br />EACH <br />2.000 <br />$2,400.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0330 <br />WATER QUALITY MANHOLE <br />$25,000.00 <br />EACH <br />1.000 <br />$25,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0340 <br />8" PVC WASTEWATER PIPE <br />$130.00 <br />FT <br />41.000 <br />$5,330.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0350 <br />ADJUSTING BOXES <br />$150.00 <br />EACH <br />38.000 <br />$5,700.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0360 <br />Adjust Clean Out <br />$150.00 <br />EACH <br />4.000 <br />$600.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0370 <br />LEVEL 3, 1/2" DENSE WMAC <br />$60.00 <br />TON <br />4,400.000 <br />$264,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />M 0.00 <br />0380 <br />LEVEL 1, 1/2" DENSE WMAC <br />$60.00 <br />TON <br />1,250.000 <br />$75,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0390 <br />EXTRA FOR ASPHALT APPROACHES <br />$350.00 <br />EACH <br />3.000 <br />$1,050.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0400 <br />PLAIN CONCRETE PAVEMENT, 9 TH <br />$6.00 <br />SQFT <br />2,408.000 <br />$14,448.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0410 <br />PLAIN CONCRETE PAVEMENT 12" TH <br />$10.00 <br />SQFT <br />3,224.000 <br />$32,240.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0420 <br />CONCRETE CURB AND GUTTER <br />$11.00 <br />FOOT <br />5,880.000 <br />$64,680.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0430 <br />CONCRETE CURB, VARIABLE HEIGHT <br />$20.00 <br />FT <br />460.000 <br />$9,200.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0440 <br />CONCRETE CURB STANDARD <br />$40.00 <br />FT <br />32.000 <br />$1,280.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0450 <br />CONCRETE VALLEY GUTTER <br />$25.00 <br />FT <br />800.000 <br />$20,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0460 <br />4 CONC WALK <br />$6.00 <br />SQFT <br />12,710.000 <br />$76,260.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0470 <br />7 CONCRETE DRIVEWAY <br />$10.00 <br />SQFT <br />4,652.000 <br />$46,520.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0480 <br />TRUNCATED DOMES <br />$15.00 <br />SQFT <br />410.000 <br />$6,150.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0490 <br />THERMOPLASTIC, NON - PROFILE, 90 <br />$12,000.00 <br />LUMPSUM <br />1.000 <br />$12,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0500 <br />YELLOW CURB PAINT <br />$2.00 <br />FT <br />103.000 <br />$206.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />