New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4546 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2011
>
GJN4546 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 4:15:56 PM
Creation date
6/22/2011 1:47:22 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004546
GL_Project_Number
985374
COE_Contract_Number
2009-00030
Retention_Destruction_Date
6/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />DATE <br />CONTRACT NO. <br />1217/2010 <br />2009 -0030 <br />PROJECT NAME <br />JOB NO. <br />Crest Neighborhood Street Improvements <br />4546 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />Babb Construction Co (dba Delta Construction Co) <br />N/A <br />INSPECTOR <br />PHONE NUMBER <br />DATE OF AWARD <br />Thomas Fahsbender <br />541 -682 -8818 <br />6/23/2009 <br />FIRST NOTIFICATION <br />7/13/09 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />Stage 3, Except Plantings - October 14, 2009 (CCO#2) 10/14/09 <br />Stage 3 Plantings - October 23,2009 (CCO #5) 10/23/09 <br />Stage 3 Plant Establishment - 2 years after Plantings (CCO#4) <br />Remaining Stages, Except Plantings - October 29, 2010 (6C0#1 5) 10/29/2010 <br />Remaining Stages Planting - October 26, 2010 (CC0#17) 10/26/2010 <br />Remaining Stages Plant Establishment -1 year after Planting <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 11/24110 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />1/26/10 IS THE DATE ON WHICH ALL CONTRACT WORK FOR STAGE #3 WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. THIS NOTICE <br />DOES NOT INCLUDE THE PLANT ESTABLISHMENT PERIOD. <br />12/7/10 IS THE DATE ON WHICH ALL CONTRACT WORK FOR ALL REMAINING STAGES WAS COMPLETED, INCLUDING CORRECTIVE WORK, <br />EQUIPMENT AND PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER <br />DOCUMENTS REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. THIS <br />NOTICE DOES NOT INCLUDE THE PLANT ESTABLISHMENT PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br />WITHIN THE ONE -YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE.WITHIN THE ONE -YEAR WARRANTY PERIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />Inspector Signature <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager File Ginger Perales, PWM Kris Olson, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />POS Maintenance - Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />Q:\ PROJECTS\ PROJ -6\ 4546\ Correspondence \Contractors \4546 - 20101109 Third Notification Dec 2010 rev.doc March 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.