Lan. County <br />Report ID: LBILL001 BIUABLE PROJECT COSTS Page No. 2 <br />Run Data 0421201/ <br />Run Time 15:1408 <br />Billable Project Costa for Fiscal Period 2011 -03 Period begins 03/012011 and ands including 033112011 <br />Project: 36644609 ACM1xVerifi Billable HOLD Overhead Rate. Applied for Him project: Federal (Where appUe.bI.) <br />03/092011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$7938 <br />$10540 <br />WILDISH ROCK SHAKING <br />03/10/2011 <br />LABOR <br />Engmeenng Teeb mian2 <br />1 <br />523.14 <br />S3073 <br />MIX DESIGN <br />03/102011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$14053 <br />WILDISH ROCK SHAKING <br />031112011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />$30.73 <br />MIX DESIGN <br />03/142011 <br />LABOR <br />Engineering Technician 2 <br />2 5 <br />$57.85 <br />$7691 <br />MIX DESIGN <br />03/152011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$6145 <br />MIX DESIGN <br />03/162011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$4628 <br />$6145 <br />MIX DESIGN <br />03/172011 <br />LABOR <br />Bugmeed.g Technicmn2 <br />1 <br />$23.14 <br />$30.73 <br />MIX DESIGN <br />03/182011 <br />LABOR <br />Engmeenng Technician 2 <br />2 <br />$4628 <br />$6145 <br />MIX DESIGN <br />03/192011 <br />LABOR <br />Engineering Technician 3 <br />4 <br />$10500 <br />$139.42 <br />KR L2 l2 <br />P4135 Totals <br />$.3168.90 <br />54207.66 <br />5737656 <br />P4165 -Final mrvey computations <br />T.Date <br />Tran1D <br />Resource Employed <br />Qty <br />Amoont <br />Overhead <br />Tmnaection Remark <br />031142011 <br />LABOR <br />Engineering Technician 2 <br />35 <br />$9261 <br />$12297 <br />WILDISH AGO PREP <br />031152011 <br />LABOR <br />Engineering Technician 2 <br />4 <br />$105.84 <br />$14053 <br />WILDISH AGO PREP <br />03/16/2011 <br />LABOR <br />Engineering Technician 2 <br />35 <br />$92.61 <br />$12297 <br />WILDISH AGO PREP <br />03//82011 <br />LABOR <br />Engineering Technician 2 <br />25 <br />$6615 <br />$87.83 <br />WILDISH AGO PREP <br />P4165 Total. <br />$ 35711 <br />S 47430 <br />S 831.51 <br />3636213 Materials Testine Total 6 8392.85 <br />36644609 Project Grand Total $ 8392.85 <br />