Summary of ALL PTO Project Time <br />April 2009 through May 2010 <br />April thru August 2009 <br />Date <br />April <br />SpCk <br />PTO <br />22 <br />1 <br />30 <br />1.5 <br />Ma <br />2 <br />.5 <br />4 <br />1 <br />5 <br />.5 <br />June <br />12 <br />1.5 <br />Jul <br />13 <br />.5 <br />Au <br />3 <br />1 <br />TOT <br />7.5 <br />Date <br />Set <br />SpCk <br />PTO <br />8 <br />.5 <br />9 <br />1 <br />14 <br />.5 <br />17 <br />1 <br />22 <br />1 <br />Oct <br />5 <br />.5 <br />6 <br />.5 <br />15 <br />1 <br />16 <br />1.25 <br />27 <br />1.5 <br />28 <br />2.25 <br />29 <br />1.75 <br />30 <br />.75' <br />EHI <br />September and November 2009 1 <br />