Run Date: 04/05/2011 11:36:14 <br />Contractor: MOWAT CONSTRUCTION CO. <br />Job 93-004378 <br />Contract No: 2010-00003 <br />PO 2010100057 <br />Assessable: No <br />Line Description Last Chng Ord <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity <br />Page 7 <br />% Complete <br />1290 <br />PED. IS. BI-DIRECT PAV MARKER <br />004 <br />$5.40 <br />EACH <br />50.000 <br />$270.00 <br />0.000 <br />$0.00 <br />80.000 <br />$432.00 <br />160.00 <br />1300 <br />PED. IS. THERM NON-PROFILE 400 <br />004 <br />$2.16 <br />LINFT <br />1,970.000 <br />$4,255.20 <br />0.000 <br />$0.00 <br />2,284.000 <br />$4,933.44 <br />116.00 <br />1310 <br />PED. IS. PAVE LEGEND, TYPE A A <br />004 <br />$108.00 <br />EACH <br />3.000 <br />$324.00 <br />0.000 <br />$0.00 <br />3.000 <br />$324.00 <br />100.00 <br />1320 <br />PED. IS. PAVE BAR, TYPE A 4004 <br />004 <br />$5.40 <br />SQFT <br />1,060.000 <br />$5,724.00 <br />0.000 <br />$0.00 <br />940.000 <br />$5,076.00 <br />89.00 <br />1330 <br />PED. IS. SQ TUBE SIGN SUP W/FT <br />004 <br />$207.00 <br />EACH <br />6.000 <br />$1,242.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />1340 <br />PED. IS. TYPE W1 SIGN IN PLACE <br />004 <br />$8.64 <br />SQFT <br />10.000 <br />$86.40 <br />0.000 <br />$0.00 <br />10.000 <br />$86.40 <br />100.00 <br />1350 <br />PED. IS TYPE Yl SIGNS IN PLACE <br />004 <br />$8.64 <br />SQFT <br />44.000 <br />$380.16 <br />0.000 <br />$0.00 <br />62.000 <br />$535.68 <br />141.00 <br />1360 <br />PED. IS. TOP SOIL 4004GG <br />004 <br />$21.00 <br />CUYD <br />70.000 <br />$1,470.00 <br />0.000 <br />$0.00 <br />73.720 <br />$1,548.12 <br />105.00 <br />1370 <br />PED. IS. BARK MULCH 4004RH <br />004 <br />$37.80 <br />CUYD <br />15.000 <br />$567.00 <br />0.000 <br />$0.00 <br />15.100 <br />$570.78 <br />101.00 <br />1380 <br />PED. IS. IRRIGATION SYS 400411 <br />004 <br />$244.00 <br />LUMPSUM <br />1.000 <br />$244.00 <br />0.000 <br />$0.00 <br />1.000 <br />$244.00 <br />100.00 <br />1390 <br />ARTWORK FOUNDATION 4005 <br />005 <br />$16,301.19 <br />LUMPSUM <br />1.000 <br />$16,301.19 <br />0.000 <br />$0.00 <br />1.000 <br />$16,301.19 <br />100.00 <br />1400 <br />MOBILIZATION FOR LIGHTING(ADDI <br />006 <br />$21,899.90 <br />LUMPSUM <br />1.000 <br />$21,899.90 <br />0.000 <br />$0.00 <br />1.000 <br />$21,899.90 <br />100.00 <br />1410 <br />TEMP PROTECT/DIRECT OF TRAFFIC <br />006 <br />$21,603.25 <br />LUMPSUM <br />1.000 <br />$21,603.25 <br />0.000 <br />$0.00 <br />1.000 <br />$21,603.25 <br />100.00 <br />1420 <br />ELECTRICAL SERVICE REVISIONS 4 <br />006 <br />$14,757.31 <br />LUMPSUM <br />1.000 <br />$14,757.31 <br />0.000 <br />$0.00 <br />1.000 <br />$14,757.31 <br />100.00 <br />1430 <br />PATH LIGHTING REVISIONS 4006D <br />006 <br />$26,896.32 <br />LUMPSUM <br />1.000 <br />$26,896.32 <br />0.000 <br />$0.00 <br />1.000 <br />$26,896.32 <br />100.00 <br />1440 <br />DECORATIVE STAY LIGHTING 4006E <br />006 <br />$86,796.64 <br />LUMPSUM <br />1.000 <br />$86,796.64 <br />0.000 <br />$0.00 <br />1.000 <br />$86,796.64 <br />100.00 <br />1450 <br />DECORATIVE DECK EDGE LIGHTING <br />006 <br />$70,335.00 <br />LUMPSUM <br />1.000 <br />$70,335.00 <br />0.000 <br />$0.00 <br />1.000 <br />$70,335.00 <br />100.00 <br />1451 <br />MODIFY BRIDGE RAIL POST SPACIN <br />007 <br />$14,734.05 <br />LUMPSUM <br />1.000 <br />$14,734.05 <br />0.000 <br />$0.00 <br />1.000 <br />$14,734.05 <br />100.00 <br />1460 <br />MANHOLE CONFLICT AT BENT 16 4 <br />008 <br />$2,427.79 <br />LUMPSUM <br />1.000 <br />$2,427.79 <br />0.000 <br />$0.00 <br />1.000 <br />$2,427.79 <br />100.00 <br />1470 <br />EXTEND TOP OF MSE WALL PANELS <br />009 <br />$1,271.66 <br />LUMPSUM <br />1.000 <br />$1,271.66 <br />0.000 <br />$0.00 <br />1.000 <br />$1,271.66 <br />100.00 <br />1480 <br />MODIFY MSE WALL PANEL STORM PI <br />009 <br />$151.20 <br />LUMPSUM <br />1.000 <br />$151.20 <br />0.000 <br />$0.00 <br />1.000 <br />$151.20 <br />100.00 <br />1490 <br />MODIFY LIGHTING 4010 <br />010 <br />$3,905.43 <br />LUMPSUM <br />1.000 <br />$3,905.43 <br />0.000 <br />$0.00 <br />1.000 <br />$3,905.43 <br />100.00 <br />1500 <br />STAY ANCHORAGE STRENGTHING 401 <br />011 <br />$6,386.65 <br />LUMPSUM <br />1.000 <br />$6,386.65 <br />0.000 <br />$0.00 <br />1.000 <br />$6,386.65 <br />100.00 <br />1510 <br />BT 16 TOWER BASE REPAIRS 4011B <br />011 <br />$291.60 <br />LUMPSUM <br />1.000 <br />$291.60 <br />0.000 <br />$0.00 <br />1.000 <br />$291.60 <br />100.00 <br />1520 <br />CONSTRUCT RETAINING WALL <br />Oil <br />$2,610.89 <br />LUMPSUM <br />1.000 <br />$2,610.89 <br />0.000 <br />$0.00 <br />1.000 <br />$2,610.89 <br />100.00 <br />1530 <br />REPAIR EXISTING AREA DRAIN 401 <br />Oil <br />$261.65 <br />LUMPSUM <br />1.000 <br />$261.65 <br />0.000 <br />$0.00 <br />1.000 <br />$261.65 <br />100.00 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 020.. <br />Original Contract: $3,438,410.50 <br />Current Amount: $3,885,010.02 <br />Contract Award Date: 07/27/2009 <br />Completion Date: 08/31/2010 <br />Current Contract <br />Unit Price Unit Measure Quantity <br />Amount <br />