<br />Contractor: EUGENE SAND CONSTRUCTION
<br />Job 93-004693
<br />Contract No: 2011-00002
<br />PO
<br />Assessable: No
<br />City of Eugene
<br />Contract Preliminary Progress Payment
<br />Payment No : 005 Final Pay
<br />Original Contract: $395,087.00
<br />Current Amount: $401,720.88
<br />Contract Award Date: 07/20/2010
<br />Completion Date: 10/22/2010
<br />Page 2
<br />Current Contract
<br />Estimated Payment
<br />Cumulative
<br />Totals
<br />% Complete
<br />Line
<br />Description Last Chng Ord
<br />Unit Price
<br />Unit Measure
<br />Quantity
<br />Amount
<br />Quantity
<br />Amount
<br />Quantity
<br />Amount
<br />2010 OPEN TRENCH WW REHABILITATION
<br />General
<br />0000
<br />Liquidated Damages
<br />($500.00)
<br />DAY
<br />0.000
<br />$0.00
<br />0.000
<br />$0.00
<br />0.000
<br />$0.00
<br />0.00
<br />0010
<br />MOBILIZATION
<br />$39,500.00
<br />LUMPSUM
<br />1.000
<br />$39,500.00
<br />0.000
<br />$0.00
<br />1.000
<br />$39,500.00
<br />100.00
<br />0020
<br />FLAGGERS
<br />$45.00
<br />HOUR
<br />60.000
<br />$2,700.00
<br />0.000
<br />$0.00
<br />155.000
<br />$6,975.00
<br />258.00
<br />0030
<br />TEMP. PROTECTION AND DIRECTION
<br />$6,000.00
<br />LUMPSUM
<br />1.000
<br />$6,000.00
<br />0.000
<br />$0.00
<br />1.000
<br />$6,000.00
<br />100.00
<br />0040•
<br />EROSION CONTROL
<br />$500.00
<br />LUMPSUM
<br />1.000
<br />$500.00
<br />0.000
<br />$0.00
<br />1.000
<br />$500.00
<br />100.00
<br />0050
<br />ROCK EXCAVATION
<br />$30.00
<br />CUYD
<br />150.000
<br />$4,500.00
<br />0.000
<br />$0.00
<br />17.000
<br />$510.00
<br />11.00
<br />0060
<br />DYE TEST AND CONNECTION VERIFI
<br />$130.00
<br />EACH
<br />44.000
<br />$5,720.00
<br />0.000
<br />$0.00
<br />42.000
<br />$5,460.00
<br />95.00
<br />0070
<br />PIPE BURSTING AND HDPE LINER,
<br />$50.00
<br />FOOT
<br />141.000
<br />$7,050.00
<br />0.000
<br />$0.00
<br />136.000
<br />$6,800.00
<br />96.00
<br />0080
<br />TV INSPECT AND LOCATE SERVICE
<br />$300.00
<br />EACH
<br />15.000
<br />$4,500.00
<br />0.000
<br />$0.00
<br />3.000
<br />$900.00
<br />20.00
<br />0090
<br />VIDEO INSPECTION
<br />$4,500.00
<br />LUMPSUM
<br />1.000
<br />$4,500.00
<br />0.000
<br />$0.00
<br />1.000
<br />$4,500.00
<br />100.00
<br />0100
<br />6 INCH PVC WASTEWATER PIPE
<br />$39.00
<br />FOOT
<br />596.000
<br />$23,244.00
<br />0.000
<br />$0.00
<br />514.000
<br />$20,046.00
<br />86.00
<br />0110
<br />6 INCH C900 PIPE
<br />$39.00
<br />FOOT
<br />197.000
<br />$7,683.00
<br />0.000
<br />$0.00
<br />149.000
<br />$5,811.00
<br />76.00
<br />0120
<br />8 INCH PVC PIPE
<br />$76.00
<br />FOOT
<br />2,318.000
<br />$176,168.00
<br />0.000
<br />$0.00
<br />2,356.000
<br />$179,056.00 M
<br />102.00
<br />0130
<br />8 INCH C900 PIPE
<br />$72.00
<br />FOOT
<br />563.000
<br />$40,536.00
<br />0.000
<br />$0.00
<br />502.000
<br />$36,144.00 M
<br />89.00
<br />0140
<br />CLEANOUT 6 INCH
<br />$325.00
<br />EACH
<br />3.000
<br />$975.00
<br />0.000
<br />$0.00
<br />3.000
<br />$975.00
<br />100.00
<br />0150
<br />PIPE REPAIR - 30" STORM DRAIN
<br />$3,000.00
<br />LUMPSUM
<br />1.000
<br />$3,000.00
<br />0.000
<br />$0.00
<br />0.000
<br />$0.00
<br />0.00
<br />0160
<br />CONCRETE MANHOLE, WASTEWATER
<br />$2,000.00
<br />EACH
<br />2.000
<br />$4,000.00
<br />0.000
<br />$0.00
<br />3.000
<br />$6,000.00
<br />150.00
<br /> ' 0170
<br />CONCRETE MANHOLE, FLAT TOP WAS
<br />$1,800.00
<br />EACH
<br />2.000
<br />$3,600.00
<br />0.000
<br />$0.00
<br />2.000
<br />$3,600.00
<br />100.00
<br />0180
<br />CORE INTO EXISTING MANHOLE
<br />$400.00
<br />EACH
<br />2.000
<br />$800.00
<br />0.000
<br />$0.00
<br />1.000
<br />$400.00
<br />50.00
<br />0190
<br />MINOR ADJUSTMENT OF MANHOLES
<br />$350.00
<br />EACH
<br />5.000
<br />$1,750.00
<br />0.000
<br />$0.00
<br />8.000
<br />$2,800.00
<br />160.00
<br />0200
<br />MAJOR ADJUSTMENT OF MANHOLES
<br />$500.00
<br />EACH
<br />1.000
<br />$500.00
<br />1.000
<br />$500.00
<br />1.000
<br />$500.00
<br />100.00
<br />0210
<br />ADJUST MANHOLE CHANNEL
<br />$500.00
<br />EACH
<br />1.000
<br />$500.00
<br />0.000
<br />$0.00
<br />2.000
<br />$1,000.00
<br />200.00
<br />0220
<br />POTHOLE
<br />$500.00
<br />EACH
<br />8.000
<br />$4,000.00
<br />0.000
<br />$0.00
<br />10.000
<br />$5,000.00
<br />125.00
<br />0230
<br />RECONNECT SERVICE LINE
<br />$100.00
<br />EACH
<br />69.000
<br />$6,900.00
<br />0.000
<br />$0.00
<br />70.000
<br />$7,000.00
<br />101.00
<br />0240
<br />RECONSTRUCT EXISTING EXTERIOR
<br />$1,000.00
<br />EACH
<br />2.000
<br />$2,000.00
<br />0.000
<br />$0.00
<br />2.000
<br />$2,000.00
<br />100.00