New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Eugene Sand Construction (CPM) Inv 50.179.502
COE
>
PW
>
POS_PWM
>
AP
>
Eugene Sand Construction (CPM) Inv 50.179.502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2011 11:59:17 AM
Creation date
3/29/2011 11:46:21 AM
Metadata
Fields
Template:
PW_Contract
COE_Contract_Number
2010-00405
PW_Document_Type_Contract
AP/AR Invoices
Contract Status
Active
Organization
Eugene Sand Construction
PW_Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Masoner
Purchase_Order_Number
2011012193
Document_Number
50.179.502
Account_Code
534-9474-61739
Is Permanent?
No
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EUGENB SAND A GRAVJ?1, RVC <br />Pokwp 112 ton <br />GENERAL ESTIMATE SUMMARY <br />. <br />PRICE AGREEMENT <br />City of Eugene - Dig point Repair Project #2007 -I <br />' PROJECT LOCATION: <br />Jacobs Sewer Repair <br />3.0 <br />phase code, 50.179.602 <br />PROJECT DATES: <br />$69.00 <br />. i <br />t "PRICES REVISED PER 4 AMENDMENT W <br />FILENAME <br />cu.®W.rUwv� 11:37AM <br />Pokwp 112 ton <br />2.0 <br />HR <br />a1e.eU <br />.row <br />2 <br />1 ton Utility Craw Truck <br />3.0 <br />HR <br />$23.00 <br />$69.00 <br />3 <br />Backlue 88010peretor <br />0.0 <br />HR <br />$77.00 <br />$0.00 <br />4 <br />BeckluelWhacker 58010Pemter <br />2.0 <br />HR <br />$96.00 <br />$192.00 <br />6 <br />Treckhoe/Operator (40,0DD 1 ) JD' 49D <br />4.0 <br />HR <br />$101.00 <br />" $404.00 <br />6 <br />TreckboelOPerstor(50,000#) JD 690 <br />0.0 <br />HR <br />$118.00 <br />$0.00 <br />7 <br />TrackhoelOPeartor(60,000 JD 690 <br />0.0 <br />HR <br />$126.00 <br />$0.00 <br />8 <br />Treckhoa/Operelor (70,000 JD 892 <br />0.0 <br />HR <br />$141.00 <br />$0-00 <br />9 <br />Dozer D310peralcr <br />0.0 <br />HR <br />$91.00 <br />$0.00 <br />10 <br />Dozer D6l0perstor <br />0.0 <br />HR <br />$109.00 <br />$0.00 <br />11 <br />Dozer D7/0peralor <br />0.0 <br />HR <br />$188.00 <br />- $0.00 <br />12 <br />Huber/Operator <br />010 <br />HR <br />$82.00 <br />$0.00 <br />13 <br />Grader 120 G/Operetor <br />0.0 <br />HR <br />$87.00 <br />$0.00 <br />14 <br />Grader 1400/Operator <br />0.0 <br />HR <br />$96.00 - <br />$0.00 <br />15 <br />Water TrucklDriver <br />0.0 <br />HR <br />$76.00 <br />$0.00 <br />16 <br />ti-8 ton Asphalt Vib. Roller /Operator <br />1.0 <br />HR <br />$99.00 <br />$98'00 <br />$9.00 <br />17 <br />Wheel Loader, 2 yd /Operator, JD 544 <br />0.0 <br />HR <br />$92A0 <br />18 <br />Wheel Loader, 3 yd/Operetor, JD 644 <br />0.0 <br />HR <br />$94.00 <br />$O.OD. <br />19 <br />5 yd Dump TrucWOpantor <br />0.0 <br />HR <br />$74.00 <br />$ <br />20 <br />10 yd Dump Truk/Operator <br />22.6 <br />HR <br />$76.00 <br />$1,710.00 <br />21 <br />10 yd Dump Trk. W/Pup Trir,/Opbmtor <br />0.0 <br />HR <br />$82.00 <br />$0.00 <br />22 <br />Rcto-Miller <br />0.0 <br />BY <br />$6.11 <br />$ <br />23 <br />. Move Truk B TrailerlOpemtor - <br />8.8 <br />HR <br />$82.00 <br />$553.50 <br />$0.00 <br />24 <br />Rented Dump Trucks <br />O.o <br />HR <br />$75,00 <br />$17.01) <br />$ <br />25 <br />By -Peas Pump, 3" outlet <br />0.0 <br />HR <br />HR <br />$17.00 <br />$0.00 <br />28 <br />Da- Watering Pump 2' outlet <br />0.0 <br />KR <br />$27.00 <br />$0'00 <br />27. <br />De-Wabuing Pump 4' outlet <br />0.0 <br />HR <br />$16.00 <br />$0.00 <br />28 <br />Trench Box <br />0,0 <br />0.0 <br />HR <br />$16.00 <br />$0.00 <br />29 <br />30 <br />Manhole box <br />Labor, StrelghtTime <br />65.3 <br />HR <br />$41.75 <br />$2,306.69 <br />31 <br />Flagging <br />49.3 <br />HR <br />$32.00 <br />$1,676.00 <br />32 <br />3/4" -O Crushed Rock <br />58.79 <br />TON <br />$7.10 <br />$417.41 <br />$0.00 <br />33 <br />1 12"- 0 Crushed Rock <br />0.0 <br />TON <br />$7.10 <br />. <br />$0.00 <br />34 <br />3 Crushed Rock <br />0.0 <br />TON <br />Cy <br />$7,60 <br />$76.00 <br />$0.00 <br />35 <br />as <br />C.D.F. <br />01.'C" Asphalt <br />0.0 <br />12.18 <br />TON <br />$49.80 <br />$606.67 <br />37 <br />4 pal Conpeto (Compl. In-Plese) <br />0.00 <br />SF <br />$5.10 <br />$0.00 <br />S8 <br />6' 3300 pal Concrete (Compl. In -0leoe) <br />0.00 <br />SF <br />$6.30 <br />$0.00 <br />39 <br />7" 3300 pal Concrete (Compl. ln-Place) <br />0.00 <br />SF <br />$7.40 <br />- $0.00 <br />40 <br />Standard Sedimentation Manhole (Matra Only) <br />0.0 <br />EA <br />$2,140.00 <br />$9.00 <br />41 <br />Standard Manhole (Mail's Only) <br />0.0 <br />FA <br />$1,690.00 <br />$0.00 <br />42 <br />Standard Clean-Out <br />O.D <br />EA <br />$170.00 <br />$o.00 <br />$0.00 <br />43 <br />Standard 4A Inlet (Complete) <br />0.0 <br />EA <br />$1,165.00 <br />$ 01 . 00 <br />44 <br />Standard Catch Basin (Complete) <br />0.0 <br />FA <br />$1,000.00 <br />$0.00 <br />45 <br />12" Area Drain <br />0.0 <br />EA <br />FA <br />$316.25 <br />$417.60 <br />$0.00 <br />46 <br />24" Area Drain <br />0.0 <br />0.0 <br />LF <br />$21.60 <br />$0.00 <br />47 <br />Curb & Gutter <br />0.0 <br />LF <br />$2.65 <br />$0.00 <br />46 <br />WPVC Pipe (T -26) <br />0.0 <br />LF <br />$2.65 <br />$D.00 <br />49 <br />6' PVC Pipe (2 1001 <br />0.0 <br />LF <br />- $2.65 <br />$0.00 <br />50 <br />6" PVC Pipe (101 <br />13.0 <br />LF <br />$4.00 <br />S%.OS <br />51 <br />e" PVC Pipe (1'- 261 <br />0.0 <br />LF <br />$4.00 <br />$0.00 <br />52 <br />S' PVC Pipe (25'- IM <br />0,0 <br />LF <br />$4.00 <br />$5.00 <br />53 <br />S' PVC PiPa (101' +) <br />0.0 <br />LF <br />$6.30 <br />$0.00 <br />54 <br />10" PVC Pipe (1' -26) <br />0.0 <br />LF <br />$6.30 <br />$ <br />56 <br />1o" PVC Pipe (26' -10(y) <br />D.0 <br />LF <br />$6.30 <br />$0.00 <br />56 <br />10' PVC Pipe (101' +) <br />0.0 <br />LF <br />$2.55 <br />$0.00 <br />57 <br />e' PVC Drain Pipe (V - 251 <br />LF <br />$2.55 <br />$0'00 <br />58 <br />6' PVC Drain Pipe (26'- 1W) <br />0.0 <br />$0.00 <br />69 <br />6" PVC Drain Pipe (1 OV +) <br />0.0 <br />LF <br />$2.66 <br />$0.00 <br />60 <br />W PVC Drain Pipe (1'- 26) <br />0.0 <br />LF <br />$4.00 <br />$0 <br />61 <br />8 PVC Drain Pipe (26' -100 <br />0.0 <br />LF <br />$ <br />$4.00 <br />3 <br />62 <br />(' PVC Drain Pipe (101' +) <br />- 0.0 <br />LF <br />$8.30 <br />$0.90 <br />63 <br />10' PVC Drain Pipe (1' - 29) <br />0.0 <br />LF <br />$6.30 <br />$0.00 <br />64 <br />10" PVC Drain Pipe (26' -100') <br />0.0 <br />LF <br />$6.30 <br />$0.00 <br />65 <br />10" PVC Drain Pipe (101' +) <br />0,0 <br />LF <br />$0.00 <br />66 <br />12' PVC Drain Pipe (1'- 25') <br />0.0 <br />LF <br />$9.00 <br />$0.00 <br />67 <br />12" PVC Drain Pipe (26' -100') <br />0.0 <br />LF <br />$9.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.