Lane County <br />Report ID. LBILL001 BILLABLE PROJECT COSTS Page No I <br />Run Date 03/022011 <br />Run Tune 16 24 32 <br />Billable Project Costs for Fiscal Period 2011-01 Period begins 011012011 and ends including 0121/2011 <br />Project: 36644609 AC Mix Verili Billable HOLD overhead Rates Applied for this pmjec0 Opera Bonal (Where appanbl.) <br />Billed Bv' 3636213 Materials Testint=_ Proi: 36644609 <br />P4085-Asphalt concrete glty, control <br />TrenDate <br />TrmID <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />01/142011 <br />LABOR <br />Engineering Technician 3 <br />8 <br />$21000 <br />$342.97 <br />KR L312 VOIDS AND RICE <br />P4085 Tomb <br />5 210.00 <br />5 342.97 <br />5 552.97 <br />P4135-Mir design <br />TmnDate <br />TmalD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />12272010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />AGO PREP <br />12272010 <br />LABOR <br />Engineering Technician 2 <br />5 <br />$132.30 <br />5216.07 <br />KNIFE RIVER ROCK PREP <br />12/2812010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$4618 <br />$7S 58 <br />AGG PREP <br />12282010 <br />LABOR <br />Engineering Tachnicieo 2 <br />5 <br />$132.30 <br />$216.07 <br />KNIFE RIVERROCKPREP <br />12292010 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$69.42 <br />5113 38 <br />AGO PREP <br />12292010 <br />LABOR <br />Engineering Technician 2 <br />5 <br />$132.30 <br />$216.07 <br />KNIFE RIVER ROCK PREP <br />12/302010 <br />LABOR <br />Engmeanng Technician 2 <br />4 <br />$92.56 <br />$151 17 <br />AGO PREP <br />01/032011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$69.42 <br />$113 38 <br />AGO PREP <br />011032011 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$2646 <br />$4321 <br />KNIFE RIVER AC ROCK PREP <br />01/0412011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$75.58 <br />AGO PREP <br />011042011 <br />LABOR <br />Engineering Technician 2 <br />3 <br />$79.38 <br />512964 <br />KNIFE RIVER AC ROCK PREP <br />01/052011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$46.28 <br />$7558 <br />AGO PREP <br />01/052011 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$52.92 <br />$8643 <br />KNIFE RIVER AC ROCK PREP <br />011142011 <br />LABOR <br />Engineering Technician 2 <br />8 <br />$211.68 <br />S34572 <br />KNIFE RIVER MIX VERIFICATION <br />01/1812011 <br />LABOR <br />Engineering Technician 2 <br />7 <br />$185.22 <br />$302.50 <br />KR MIX VERIFICATION <br />01/192011 <br />LABOR <br />Superrnemg Engineering Assoc <br />2 <br />$71.64 <br />$117.00 <br />KNIFE RIVER L3C <br />01202011 <br />LABOR <br />Engineenng Technician 2 <br />3 <br />$79.38 <br />$129.64 <br />KR MIX VERIFICATION <br />P4135 Totals <br />$ 1520.10 <br />5 2482.60 <br />$ 4002.70 <br />3636213 Materials Testine Total $ 4555.67 <br />36644609 Proiect Grand Total $ 4555.67 <br />r` <br />