New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PWM-001351 UO 2010 Game Control
COE
>
PW
>
POS_PWM
>
AR
>
PWM-001351 UO 2010 Game Control
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 12:30:27 PM
Creation date
3/25/2011 12:30:27 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
AP/AR Invoices
Fiscal_Year
2011
PW_Division
Waste Water
GL_Fund
131
GL_ORG
9426
Document_Number
PWM-001351
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Accounts Receivable Worksheet <br />Peak Works Watenanue; Treffic Oeeradone, <br />1820 R..;.N RNd, Eugene, OR 97402 <br />(641) 682-480 <br />Party: <br />U of 0 VS UCLA <br />711,,77�_777 <br />LABUK I U I AL: <br />FQUIF)MFNT�. <br />Employ.. <br />Hourly <br />Rate <br />+ <br />Benefit <br />Rate <br />Numberof <br />units <br />Base <br />Rat. <br />x <br />Total <br />Hours <br />x <br />Overhead <br />28.31-A <br />$183.00 <br />Employee <br />Charge <br />Represented Employees: <br />167.76 <br />167.76 <br />1 Ton Utlity truck <br />304064 <br />12.90 <br />13,00 <br />1 Ton Utility truck <br />305057 <br />12 111 <br />$0.00 <br />13.110 <br />Maintenance Worker 2 <br />$21.05 <br />1 Ton Utility truck <br />$12.41 <br />0.00 <br />$33.46 <br />$0.00 <br />3.5 <br />0.00 <br />1.2831 <br />$150.2 <br />Maintenance Worker 2 <br />$21.05 <br />$0.00 <br />$12.41 <br />$0.00 <br />33.46 <br />0.00 <br />3.5 <br />1.2831 <br />0.00 <br />$150.26 <br />Maintenance Worloer 4 <br />$26.22 <br />$13.99 <br />$40.21 <br />1$47.21 <br />$0.00 <br />3.6 <br />0.00 <br />1,2831 <br />$180.58 <br />0.00 <br />$0.00 <br />EQUIPMENTTOTAL: <br />$().00 <br />$0.00 <br />$0.00 <br />0 <br />1.2831 <br />$0.00 <br />$0.00 <br />OT� <br />$0.00i <br />$000 <br />==T�so i <br />'T <br />$31.58 <br />$0,001 <br />$1&63 <br />1 $0.00 <br />$4721 <br />9.5 <br />1.2831 <br />$575+40, <br />Maintenance Work I er2 <br />$31.58 <br />$15.63 <br />9.5 <br />1.2831 <br />$575.40 <br />Maintenance Worker 2 <br />$31.58 <br />$15.63 <br />$47.21 <br />8.51 <br />1 1+2831 <br />$514.83 <br />Maintenance Worker 4 <br />$39.33 <br />$17.99 <br />$57.32 <br />9.5 <br />1.2831 <br />698.70 <br />Maintenance Workerl <br />$31.58 <br />$15.63 <br />$47.21 <br />11 <br />1.2831 <br />$666.33 <br />Exempt Employees: <br />$0.00 <br />$0.00 <br />$0.00 <br />0 <br />1.2831 <br />0.06 <br />1!- <br />Exempt Employees OT: <br />$0.00 <br />$0.00 <br />$0.00 <br />0 <br />1.2831 <br />$0.00 <br />LABUK I U I AL: <br />FQUIF)MFNT�. <br />Equipment Type <br />Hourly <br />Rate <br />x <br />Total <br />Hours <br />Numberof <br />units <br />Equipment <br />Charge <br />Overhead <br />to% <br />Equipmentl) scription <br />304058 <br />12.90 <br />$183.00 <br />13.00 <br />1 <br />167.76 <br />167.76 <br />1 Ton Utlity truck <br />304064 <br />12.90 <br />13,00 <br />1 Ton Utility truck <br />305057 <br />12 111 <br />$0.00 <br />13.110 <br />$0.00 <br />157.72 <br />1 Ton Utility truck <br />0.00 <br />$0.00 <br />0.00 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />0.00 <br />0.00 <br />$0.00 <br />0.00 <br />0.00 <br />$0.00 <br />0.00 <br />0.00 <br />EQUIPMENTTOTAL: <br />$0.00 <br />MATERIALS <br />Labor <br />Material Type <br />Actual <br />Cost <br />X <br />Numberof <br />units <br />+ <br />Overhead <br />to% <br />$493.24 <br />Material <br />Charge <br />Cone replacement <br />$183.00 <br />$201.30 <br />1 <br />$18.30 <br />$201.30 <br />$0.00 <br />$0.00 <br />$0.00 <br />MOO <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$ <br />$0.00i <br />$000 <br />$0,001 <br />1 $0.00 <br />MA I LKIAL I U I AL: <br />Form <br />Billing Worksheet Traffic <br />I wul.ju <br />Page 1 of I <br />. ... .. ... TO TA L <br />Labor <br />$3,511.77 <br />- Charges <br />Equipment <br />barges <br />$493.24 <br />Material <br />Charges <br />$201.30 <br />I U I AL: I g4,Z(lb.31 <br />Document N.. 578 <br />Last Revised: 10107110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.