Sent Sy:,.DJC LEGAL; 503 222 5358; Mar-3-09 9:42PM; Page 214 <br />CITY OF EUGENE <br />2006 PAVEMENT PRESERVATION <br />Bide due 2:00 pm, Aug. 27 <br />CALL FOR BIDS <br />BID NO. 28 <br />Notice to hereby given that the City <br />Council of the City of Euguno. Oregon will <br />receive Soared bids unit Wednesday. Au• <br />gust 27, 2008, until the Bid Closing time at <br />2.W p.m at the office Ot file City Engineer. <br />244 Eaat Broadway, Eugene, Oregon. The <br />Bid Opening will be at 205 p.m, One <br />Wednesday, August ?7, 2006, at the <br />duuvu location, at which limp and place <br />those Rds will be oPened and reed. <br />Job 4479 2008 PAVEMENT PRESER• <br />VATI ON <br />Roosevelt Boulevanr from Beltlrne High. <br />way to Chambon; Connector Federal Aid <br />PfOioct aX-STP-2385 (058) <br />STAGE I on Roosevelt Boulevard from <br />Chamber$ Connector to Sonata Road, (38 <br />EA Minor Adjusirin m Of Manholas; 1,498 <br />Cy Surfacing Stallilln. Plane FVMT Removal Oo2- D Bp~~70 Cold <br />0 <br />SF Cold Plane PV MT N041ovol, 7• Deep, <br />42,075 SF Cold Plane PVMT Removal, 2- <br />, 262,206 SF Coll Plane PVMT Re. <br />112.5- Deep, 6,511 TON Level 3, 1/2• <br />Donee HMAC; 1,305 TON Level 3, am- <br />Denso HMAC; 1 LS Thermoplastic, <br />Non•Prohfa, 90 Mil, Extruded; 62 EA Loop <br />Detectors Installation 125 PT Candmt Un. <br />der Hard Surfacing) <br />All work for Stage 1 short be compfelsd <br />by October 31, 2000. <br />STAGE 2 on l 8OULD'ard from <br />s necB Road [0 Beftlfoe Highway (66,330 <br />SF Pavement Removal; 9e CY Surfacing <br />9labiizallon 6,200 SF CWd Plane PVMT <br />Removal, 0'-2' Deep; 88,000 SF Cold <br />Plane PVMT Removal, 1' Deep; 31,100 <br />SF Cold Plane PVMT Removal, 2- Capp; <br />77,150 SF Colo Plane PVMT Removal, 2.5 <br />Desp; 121,500 SF Cold Plane PVMT R, <br />mom. 3' Daep; 5,542 TON Level 3, I/2• <br />Dense HMAC; 3,000 TON Level 3, 314• <br />Canse HMAC; 240 FT Concrete Wide <br />Curb and Guaer, 642 SF Concrete Walks; <br />1 LS Thermoplastic, Non-Protlle, 90 Mil, <br />Extruded; 15 EA Loop Doteclora InslBlle• <br />lion) <br />Thinyfive (35) Wank days WILL be allowed <br />for Stage 2 and all work shell be completed <br />by June 30, 2008, <br />Plans and specs imllms may be to. <br />viewed and/or obtained at the office at the <br />City Engineer, 244 East Broadway, <br />Eugene, Oregon 97401, far a <br />non-refundable foe of $16.00 plus $6.50 <br />Postage. For other revlewing locations and <br />an 1 <br />any quir"On ingarrpng line project please <br />call (541) 602. 5580, a use our Engineer. <br />ing Bid Webage <br />www.d.augerle.or.u%1PW/EnglneeringrBida 9 <br />0 review Prints and Specilroadons. <br />Bids shall be ACCOmpaniod by a tainted <br />check. oashleee check or bidders bond <br />Payable to the City Of Eugene in an <br />amount equal to ten perCont of the amount Pl <br />bid. Filing of a quaPitcation questionnaire p <br />before bidding w61 not be roquirod. Canon- is <br />gent pr corlalllonal Loafs will not be consW w <br />Lived for acceptance. No bid Will be to. u <br />cetved or Considered unless the bid con. P <br />Laing a statement by the bidder that provi- <br />Stana of ORS 279C B00 to 2700.670. This <br />project is a public works ImPrOVemanl pOj- P <br />act and Is subject to ORS279C.600 to <br />2790.670. <br />Exhibit A <br />BlddOM are required to submrr a last-liar <br />Subcontractor disclosure form. Sub• <br />slentialty e5 described in ORS 279C 370, <br />pnor to the Bid Closing Dale and time. For <br />this project the first-tier subcontractor dIs• <br />closure statematd must be submitted re. <br />gardleaa of the bid amount. <br />No bid will be epceplod by the City <br />unless It Contains a statement by Ina bid. <br />dor as a pert of the bid that the biode, w <br />Carrying Out the contract will Comply with <br />all app icab'e laws <br />Work purlormed by the Coniraclor'a own <br />orgarumfie1 must be et least 30 portent of <br />the awarded contract amount <br />'Buy America' requlroments apply on <br />this pro(ecl. <br />ALL PR HAVE MINIMUM <br />WAGE RATEJREQUIREMENTS FEDER <br />ALLY•FUNDEO PROJECTS, EXCEPT <br />LOCAL ROAD AND RURAL MINOR COL- <br />LECTOR PROJECTS, ARE SUBJECT TO <br />THE 'GENERAL WAGE <br />DETERMINATION ISSUED UNDER THE <br />DAVIS-BA- CON AND RELATED ACTS <br />FROM THE U.S. SECRETARY OF <br />LABOR, UNLESS A HIGHER WAGE <br />RATE AND FRINGE BENEFITS ARE RE, <br />OUIRED PURSUANT TO OREGON <br />LAWS 2005, CHAPTER 360, AS PROVID- <br />ED IN TH E'OREGON BUREAU OF LA. <br />TIONA ND IIN U T STPgEVA~NGPU Wq°E <br />RATES FOR PUBLIC WORKS CON. <br />TRACTS IN OREGON SUBJECT TO <br />BOTH THE STATE PWR AND FEDERAL <br />DAMS-BACON ACT' 'DETER. <br />MINATIONS' AND BOU'S 'PREVAILING <br />ABLE ON TIIE <br />ACT` <br />FEDERALLY-FUNDED „LOCALS ROAND <br />AD <br />AND RURAL MINOR COLLECTOR mo.f. <br />ECTS ARE SUBJECT TO BOLI'S <br />'PREVAILING WAGE RATES FOR PUB. <br />LIC WORKS CONTRACTS IN OREGON' <br />BOLT'S WAGE RATES ARE ALSO AVAIL- <br />ABLE AT THE ABOVE WEBSITE, <br />The city of Eugene In accordance with <br />Title VI of the Civil Rights Act 01 1964, 7e <br />Star, 252. 42 U.S.C. 2000d to 2000.4 and <br />Title 49, Code of Fedora] Rogulatlons, Do. <br />Padmont of TranspOnatlon tasuad pumu- <br />em to Such Act, hereby n0116cz all bidders <br />that It will affirmatively insure that in any <br />Contract entered Into pursuant to this ad. <br />veg130111 L disadvantaged business On- <br />orpnses Will be afforded full opportunity to <br />Submit bide in response to this invitation <br />and will not be discriminated against on the <br />rounds Of race, color or national O1191i1 In <br />onsldsration fa an award. <br />This pmjec4 conlairta a 3% MWESB As. <br />rational Target. <br />The Ctry may IBJBCI any bitl riot in com- <br />lance with all preocnt? Public bidding <br />rocadurea and require ants. and may to. <br />or for good C4use any or all tilde at to <br />at" any epe0ificalWnS Or requirement <br />Pon a finding Of Ins City that It IS In the <br />ubvc Interest ra do 901 <br />Dated Ihrs tin day of Auggust, 2008. <br />MATT RODRIDLES. P.E, <br />Project Manager <br />ublishad Aug. 5, 2006. 1013389508.11 <br />e e e e e e e e e e <br />03/02/2009 TUE 09 32 [TURN NO 5359] 16 002 <br />