Sent Sy:,.DJC LEGAL; 503 222 5358; Mar-3-09 9:42PM; Page 214
<br />CITY OF EUGENE
<br />2006 PAVEMENT PRESERVATION
<br />Bide due 2:00 pm, Aug. 27
<br />CALL FOR BIDS
<br />BID NO. 28
<br />Notice to hereby given that the City
<br />Council of the City of Euguno. Oregon will
<br />receive Soared bids unit Wednesday. Au•
<br />gust 27, 2008, until the Bid Closing time at
<br />2.W p.m at the office Ot file City Engineer.
<br />244 Eaat Broadway, Eugene, Oregon. The
<br />Bid Opening will be at 205 p.m, One
<br />Wednesday, August ?7, 2006, at the
<br />duuvu location, at which limp and place
<br />those Rds will be oPened and reed.
<br />Job 4479 2008 PAVEMENT PRESER•
<br />VATI ON
<br />Roosevelt Boulevanr from Beltlrne High.
<br />way to Chambon; Connector Federal Aid
<br />PfOioct aX-STP-2385 (058)
<br />STAGE I on Roosevelt Boulevard from
<br />Chamber$ Connector to Sonata Road, (38
<br />EA Minor Adjusirin m Of Manholas; 1,498
<br />Cy Surfacing Stallilln. Plane FVMT Removal Oo2- D Bp~~70 Cold
<br />0
<br />SF Cold Plane PV MT N041ovol, 7• Deep,
<br />42,075 SF Cold Plane PVMT Removal, 2-
<br />, 262,206 SF Coll Plane PVMT Re.
<br />112.5- Deep, 6,511 TON Level 3, 1/2•
<br />Donee HMAC; 1,305 TON Level 3, am-
<br />Denso HMAC; 1 LS Thermoplastic,
<br />Non•Prohfa, 90 Mil, Extruded; 62 EA Loop
<br />Detectors Installation 125 PT Candmt Un.
<br />der Hard Surfacing)
<br />All work for Stage 1 short be compfelsd
<br />by October 31, 2000.
<br />STAGE 2 on l 8OULD'ard from
<br />s necB Road [0 Beftlfoe Highway (66,330
<br />SF Pavement Removal; 9e CY Surfacing
<br />9labiizallon 6,200 SF CWd Plane PVMT
<br />Removal, 0'-2' Deep; 88,000 SF Cold
<br />Plane PVMT Removal, 1' Deep; 31,100
<br />SF Cold Plane PVMT Removal, 2- Capp;
<br />77,150 SF Colo Plane PVMT Removal, 2.5
<br />Desp; 121,500 SF Cold Plane PVMT R,
<br />mom. 3' Daep; 5,542 TON Level 3, I/2•
<br />Dense HMAC; 3,000 TON Level 3, 314•
<br />Canse HMAC; 240 FT Concrete Wide
<br />Curb and Guaer, 642 SF Concrete Walks;
<br />1 LS Thermoplastic, Non-Protlle, 90 Mil,
<br />Extruded; 15 EA Loop Doteclora InslBlle•
<br />lion)
<br />Thinyfive (35) Wank days WILL be allowed
<br />for Stage 2 and all work shell be completed
<br />by June 30, 2008,
<br />Plans and specs imllms may be to.
<br />viewed and/or obtained at the office at the
<br />City Engineer, 244 East Broadway,
<br />Eugene, Oregon 97401, far a
<br />non-refundable foe of $16.00 plus $6.50
<br />Postage. For other revlewing locations and
<br />an 1
<br />any quir"On ingarrpng line project please
<br />call (541) 602. 5580, a use our Engineer.
<br />ing Bid Webage
<br />www.d.augerle.or.u%1PW/EnglneeringrBida 9
<br />0 review Prints and Specilroadons.
<br />Bids shall be ACCOmpaniod by a tainted
<br />check. oashleee check or bidders bond
<br />Payable to the City Of Eugene in an
<br />amount equal to ten perCont of the amount Pl
<br />bid. Filing of a quaPitcation questionnaire p
<br />before bidding w61 not be roquirod. Canon- is
<br />gent pr corlalllonal Loafs will not be consW w
<br />Lived for acceptance. No bid Will be to. u
<br />cetved or Considered unless the bid con. P
<br />Laing a statement by the bidder that provi-
<br />Stana of ORS 279C B00 to 2700.670. This
<br />project is a public works ImPrOVemanl pOj- P
<br />act and Is subject to ORS279C.600 to
<br />2790.670.
<br />Exhibit A
<br />BlddOM are required to submrr a last-liar
<br />Subcontractor disclosure form. Sub•
<br />slentialty e5 described in ORS 279C 370,
<br />pnor to the Bid Closing Dale and time. For
<br />this project the first-tier subcontractor dIs•
<br />closure statematd must be submitted re.
<br />gardleaa of the bid amount.
<br />No bid will be epceplod by the City
<br />unless It Contains a statement by Ina bid.
<br />dor as a pert of the bid that the biode, w
<br />Carrying Out the contract will Comply with
<br />all app icab'e laws
<br />Work purlormed by the Coniraclor'a own
<br />orgarumfie1 must be et least 30 portent of
<br />the awarded contract amount
<br />'Buy America' requlroments apply on
<br />this pro(ecl.
<br />ALL PR HAVE MINIMUM
<br />WAGE RATEJREQUIREMENTS FEDER
<br />ALLY•FUNDEO PROJECTS, EXCEPT
<br />LOCAL ROAD AND RURAL MINOR COL-
<br />LECTOR PROJECTS, ARE SUBJECT TO
<br />THE 'GENERAL WAGE
<br />DETERMINATION ISSUED UNDER THE
<br />DAVIS-BA- CON AND RELATED ACTS
<br />FROM THE U.S. SECRETARY OF
<br />LABOR, UNLESS A HIGHER WAGE
<br />RATE AND FRINGE BENEFITS ARE RE,
<br />OUIRED PURSUANT TO OREGON
<br />LAWS 2005, CHAPTER 360, AS PROVID-
<br />ED IN TH E'OREGON BUREAU OF LA.
<br />TIONA ND IIN U T STPgEVA~NGPU Wq°E
<br />RATES FOR PUBLIC WORKS CON.
<br />TRACTS IN OREGON SUBJECT TO
<br />BOTH THE STATE PWR AND FEDERAL
<br />DAMS-BACON ACT' 'DETER.
<br />MINATIONS' AND BOU'S 'PREVAILING
<br />ABLE ON TIIE
<br />ACT`
<br />FEDERALLY-FUNDED „LOCALS ROAND
<br />AD
<br />AND RURAL MINOR COLLECTOR mo.f.
<br />ECTS ARE SUBJECT TO BOLI'S
<br />'PREVAILING WAGE RATES FOR PUB.
<br />LIC WORKS CONTRACTS IN OREGON'
<br />BOLT'S WAGE RATES ARE ALSO AVAIL-
<br />ABLE AT THE ABOVE WEBSITE,
<br />The city of Eugene In accordance with
<br />Title VI of the Civil Rights Act 01 1964, 7e
<br />Star, 252. 42 U.S.C. 2000d to 2000.4 and
<br />Title 49, Code of Fedora] Rogulatlons, Do.
<br />Padmont of TranspOnatlon tasuad pumu-
<br />em to Such Act, hereby n0116cz all bidders
<br />that It will affirmatively insure that in any
<br />Contract entered Into pursuant to this ad.
<br />veg130111 L disadvantaged business On-
<br />orpnses Will be afforded full opportunity to
<br />Submit bide in response to this invitation
<br />and will not be discriminated against on the
<br />rounds Of race, color or national O1191i1 In
<br />onsldsration fa an award.
<br />This pmjec4 conlairta a 3% MWESB As.
<br />rational Target.
<br />The Ctry may IBJBCI any bitl riot in com-
<br />lance with all preocnt? Public bidding
<br />rocadurea and require ants. and may to.
<br />or for good C4use any or all tilde at to
<br />at" any epe0ificalWnS Or requirement
<br />Pon a finding Of Ins City that It IS In the
<br />ubvc Interest ra do 901
<br />Dated Ihrs tin day of Auggust, 2008.
<br />MATT RODRIDLES. P.E,
<br />Project Manager
<br />ublishad Aug. 5, 2006. 1013389508.11
<br />e e e e e e e e e e
<br />03/02/2009 TUE 09 32 [TURN NO 5359] 16 002
<br />
|