Land Bank Finish Park View <br />9/14/2010 <br />800 If for Park View <br />8' paving on Park View to accomodate on street parking on the south side <br />8" AC on 6" Crushed rock <br />no sidewalks <br />no soundwall <br />Curb and gutter on south side of Park View with bulbouts at Matt <br />Does not include EWEB, Gas, Or any other utilities <br />Does not include any Wetland mitigation issues <br />Excludes SDC, or R/W costs <br />Unit <br />Qty <br />Unit Cost <br />Total <br />Mobilization <br />Is <br />-1 <br /> <br />6,934 <br />$ <br />6,934 <br />Erosion Control <br />Is <br />1 <br />$ <br />1,000 <br />$ <br />1,000 <br />Clearing & Grubbing <br />Is <br />1 <br />$ <br />1,000 <br />$ <br />1,000 <br />TPDT <br />Is <br />1. <br />$ <br />1,000 <br />$ <br />1,000 <br />excavation <br />cy <br />348 <br />$ <br />20 <br />$ <br />6,960 <br />6" crushed Rock <br />sy <br />900 <br />$ <br />6 <br />$ <br />5,400 <br />8" AC <br />to <br />296 <br />$ <br />65 <br />$ <br />19,219 <br />Curb & Gutter <br />ft <br />850 <br />$ <br />16 <br />$ <br />13,600 <br />Curb inlets. <br />ea <br />2 <br />$ <br />1,200 <br />$ <br />2,400 <br />Street Trees - <br />ea <br />22 <br />$ <br />450 <br />$ <br />9,964 <br />Seed/landscape <br />Is <br />1 <br />$ <br />4,000 <br />$ <br />4,000 <br />sawcutting <br />ft <br />800 <br />$ <br />1 <br />$ <br />800 <br />Signing <br />Is <br />1 <br />$ <br />4,000 <br />$ <br />4,000 <br />$ <br />69,343 <br />Engineering - 35% $ 24,270 <br />Contingency - 15% $ 10,402 <br />Testing $ 3,000 <br />GRAND TOTAL $107,015 <br />