Run Date: 03/09/2011 16:32:48 <br />Contractor: BROWN CONTRACTING <br />Job 93-004513 <br />Contract No: 2010-00018 <br />PO 2010100259 <br />Assessable: No <br />Line Description Last Chng Or <br />Current Contract <br />Unit Price Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity Amount <br />Complete <br />0250 <br />PVMT LEGEND, TYPE D: ARROWS <br />$289.00 EACH <br />15.000 <br />$4,335.00 <br />0.000 <br />$0.00 <br />7.000 <br />$2,023.00 <br />47.00 <br />0260 <br />BI-DIRECTIONAL YELLOW TYPE I M <br />$5.00 EACH <br />100.000 <br />$500.00 <br />0.000 <br />$0.00 <br />103.000 <br />$515.00 <br />103.00 <br />0270 <br />MONO-DIRECTIONAL CRYSTAL TYPE <br />$5.00 EACH <br />35.000 <br />$175.00 <br />0.000 <br />$0.00 <br />67.000 <br />$335.00 <br />191.00 <br />0280 <br />2 IN. ELECTRICAL CONDUIT <br />$30.00 FOOT <br />320.000 <br />$9,600.00 <br />0.000 <br />$0.00 <br />607.000 <br />$18,210.00 <br />190.00 <br />0290 <br />1-1/2 IN. ELECTRICAL CONDUIT <br />$70.00 FOOT <br />94.000 <br />$6,580.00 <br />0.000 <br />$0.00 <br />36.000 <br />$2,520.00 <br />3.8.00 <br />0300 <br />2-1/2 IN. ELECTRICAL CONDUIT <br />$68.00 FOOT <br />20.000 <br />$1,360.00 <br />0.000 <br />$0.00 <br />132.000 <br />$8,976.00 <br />660.00 <br />0310 <br />3 IN. ELECTRICAL CONDUIT <br />$110.00 FOOT <br />10.000 <br />$1,100.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0320 <br />CONCRETE JUNCTION BOXES <br />$310.00 EACH <br />6.000 <br />$1,860.00 <br />0.000 <br />$0.00 <br />8.000 <br />$2,480.00 <br />133.00 <br />0330 <br />Utility adjustments <br />$130.00 EACH <br />7.000 <br />$910.00 <br />0.000 <br />$0.00 <br />7.000 <br />$910.00 <br />100.00 <br />0340 <br />LOOP DETECTORS INSTALLATION <br />$700.00 EACH <br />40.000 <br />$28,000.00 <br />0.000 <br />$0.00 <br />40.000 <br />$28,000.00 <br />100.00 <br />0350 <br />SQUARE TUBE SIGN SUPPORTS <br />$100.00 EACH <br />3.000 <br />$300.00 <br />0.000 <br />$0.00 <br />3.000 <br />$300.00 <br />100.00 <br />0360 <br />SIGN, TRAFFIC <br />$30.00 SQFT <br />30.000 <br />$900.00 <br />0.000 <br />$0.00 <br />30.000 <br />$900.00 <br />100.00 <br />0370 <br />TRAFFIC SIGNAL COMPLETE <br />$6,000.00 LUMPSUM <br />1.000 <br />$6,000.00 <br />0.000 <br />$0.00 <br />1.000 <br />$6,000.00 <br />100.00 <br />0380 <br />PVMT LEGEND, TYPE B: BICYCLE L <br />$250.00 EACH <br />3.000 <br />$750.00 <br />0.000 <br />$0.00 <br />3.000 <br />$750.00 <br />100.00 <br />0390 <br />PVMT LEGEND, TYPE B: ARROWS <br />$230.00 EACH <br />6.000 <br />$1,380.00 <br />0.000 <br />$0.00 <br />8.000 <br />$1,840.00 <br />133.00 <br />0400 <br />PAVEMENT BAR, TYPE B <br />$7.00 SQFT <br />456.000 <br />$3,192.00 <br />0.000 <br />$0.00 <br />428.000 <br />$2,996.00 <br />94.00 <br />0410 <br />REMOVAL OF SURFACINGS <br />$13.00 SQYD <br />300.000 <br />$3,900.00 <br />0.000 <br />$0.00 <br />70.660 <br />$918.58 <br />24.00 <br />0420 <br />GEOTEXTITLE FABRIC <br />001 <br />$1.45 <br />/SQYD <br />3,355.540 <br />$4,865.53 <br />502.060 <br />$727.99 <br />3,857.600 <br />$5,593.52 <br />115.00 <br />/ <br />0430 <br />INSTALL/REMOVE TEMP ACCESS RAM <br />001 <br />$3,327.53" LUMPSUM <br />1.000 <br />$3,327.53 <br />0.000 <br />$0.00 <br />1.000 <br />$3,327.53 <br />100.00 <br />/ <br />0440 <br />RECONST VAULT LID FOR LOWER GR <br />001 <br />$1,866.52- <br />LUMPSUM <br />1.000 <br />$1,866.52 <br />0.000 <br />$0.00 <br />1.000 <br />$1,866.52' <br />100.00 <br />0450 <br />STRUCTURE DEPTH MODIFICATIONS <br />002 <br />$3,670.10✓LUMPSUM <br />1.000 <br />$3,670.10 <br />1.000 <br />$3,670.10 <br />1.000 <br />$3,670.10 <br />100.00 <br />0460 <br />NE QUAD STORM REPAIR <br />002 <br />$1,718.91✓ LUMPSUM <br />1.000 <br />$1,718.91 <br />1.000 <br />$1,718.91 <br />1.000 <br />$1,718.91 <br />100.00 <br />0470 <br />NW QUAD VAULT REINFORCEMENT <br />002 <br />$469.29`f LUMPSUM <br />1.000 <br />$469.29 <br />1.000 <br />$469.29 <br />1.000 <br />$469.29 <br />100.00 <br />0480 <br />STORM VAULT REINFORCEMENT 29TH <br />002 <br />$5,046.97V LUMPSUM <br />1.000 <br />$5,046.97 <br />1.000 <br />$5,046.97 <br />1.000 <br />$5,046.97 <br />100.00 <br />0490 <br />CITY ADDED BUSINESS ACCESS SIG <br />002 <br />$217.16 /LUMPSUM <br />1.000 <br />$217.16 <br />1.000 <br />$217.16 <br />1.000 I <br />$217.16 <br />100.00 <br />0500 <br />CHANGE SHALLOW STM PIPE MATERI <br />002 <br />$593.75, LUMPSUM <br />1.000 <br />$593.75 <br />1.000 <br />$593.75 <br />1.000 <br />$593.75 <br />100.00 <br />Page 3 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 008 <br />Original Contract: $553,004.89 <br />Current Amount: $579,245.78 <br />Contract Award Date: 04/12/2010 <br />Completion Date: 07/31/2010 <br />