Run Date: 03/09/2011 16:32:48
<br />Contractor: BROWN CONTRACTING
<br />Job 93-004513
<br />Contract No: 2010-00018
<br />PO 2010100259
<br />Assessable: No
<br />Line Description Last Chng Or
<br />Current Contract
<br />Unit Price Unit Measure Quantity
<br />Estimated Payment Cumulative Totals
<br />Amount Quantity Amount Quantity Amount
<br />Complete
<br />0250
<br />PVMT LEGEND, TYPE D: ARROWS
<br />$289.00 EACH
<br />15.000
<br />$4,335.00
<br />0.000
<br />$0.00
<br />7.000
<br />$2,023.00
<br />47.00
<br />0260
<br />BI-DIRECTIONAL YELLOW TYPE I M
<br />$5.00 EACH
<br />100.000
<br />$500.00
<br />0.000
<br />$0.00
<br />103.000
<br />$515.00
<br />103.00
<br />0270
<br />MONO-DIRECTIONAL CRYSTAL TYPE
<br />$5.00 EACH
<br />35.000
<br />$175.00
<br />0.000
<br />$0.00
<br />67.000
<br />$335.00
<br />191.00
<br />0280
<br />2 IN. ELECTRICAL CONDUIT
<br />$30.00 FOOT
<br />320.000
<br />$9,600.00
<br />0.000
<br />$0.00
<br />607.000
<br />$18,210.00
<br />190.00
<br />0290
<br />1-1/2 IN. ELECTRICAL CONDUIT
<br />$70.00 FOOT
<br />94.000
<br />$6,580.00
<br />0.000
<br />$0.00
<br />36.000
<br />$2,520.00
<br />3.8.00
<br />0300
<br />2-1/2 IN. ELECTRICAL CONDUIT
<br />$68.00 FOOT
<br />20.000
<br />$1,360.00
<br />0.000
<br />$0.00
<br />132.000
<br />$8,976.00
<br />660.00
<br />0310
<br />3 IN. ELECTRICAL CONDUIT
<br />$110.00 FOOT
<br />10.000
<br />$1,100.00
<br />0.000
<br />$0.00
<br />0.000
<br />$0.00
<br />0.00
<br />0320
<br />CONCRETE JUNCTION BOXES
<br />$310.00 EACH
<br />6.000
<br />$1,860.00
<br />0.000
<br />$0.00
<br />8.000
<br />$2,480.00
<br />133.00
<br />0330
<br />Utility adjustments
<br />$130.00 EACH
<br />7.000
<br />$910.00
<br />0.000
<br />$0.00
<br />7.000
<br />$910.00
<br />100.00
<br />0340
<br />LOOP DETECTORS INSTALLATION
<br />$700.00 EACH
<br />40.000
<br />$28,000.00
<br />0.000
<br />$0.00
<br />40.000
<br />$28,000.00
<br />100.00
<br />0350
<br />SQUARE TUBE SIGN SUPPORTS
<br />$100.00 EACH
<br />3.000
<br />$300.00
<br />0.000
<br />$0.00
<br />3.000
<br />$300.00
<br />100.00
<br />0360
<br />SIGN, TRAFFIC
<br />$30.00 SQFT
<br />30.000
<br />$900.00
<br />0.000
<br />$0.00
<br />30.000
<br />$900.00
<br />100.00
<br />0370
<br />TRAFFIC SIGNAL COMPLETE
<br />$6,000.00 LUMPSUM
<br />1.000
<br />$6,000.00
<br />0.000
<br />$0.00
<br />1.000
<br />$6,000.00
<br />100.00
<br />0380
<br />PVMT LEGEND, TYPE B: BICYCLE L
<br />$250.00 EACH
<br />3.000
<br />$750.00
<br />0.000
<br />$0.00
<br />3.000
<br />$750.00
<br />100.00
<br />0390
<br />PVMT LEGEND, TYPE B: ARROWS
<br />$230.00 EACH
<br />6.000
<br />$1,380.00
<br />0.000
<br />$0.00
<br />8.000
<br />$1,840.00
<br />133.00
<br />0400
<br />PAVEMENT BAR, TYPE B
<br />$7.00 SQFT
<br />456.000
<br />$3,192.00
<br />0.000
<br />$0.00
<br />428.000
<br />$2,996.00
<br />94.00
<br />0410
<br />REMOVAL OF SURFACINGS
<br />$13.00 SQYD
<br />300.000
<br />$3,900.00
<br />0.000
<br />$0.00
<br />70.660
<br />$918.58
<br />24.00
<br />0420
<br />GEOTEXTITLE FABRIC
<br />001
<br />$1.45
<br />/SQYD
<br />3,355.540
<br />$4,865.53
<br />502.060
<br />$727.99
<br />3,857.600
<br />$5,593.52
<br />115.00
<br />/
<br />0430
<br />INSTALL/REMOVE TEMP ACCESS RAM
<br />001
<br />$3,327.53" LUMPSUM
<br />1.000
<br />$3,327.53
<br />0.000
<br />$0.00
<br />1.000
<br />$3,327.53
<br />100.00
<br />/
<br />0440
<br />RECONST VAULT LID FOR LOWER GR
<br />001
<br />$1,866.52-
<br />LUMPSUM
<br />1.000
<br />$1,866.52
<br />0.000
<br />$0.00
<br />1.000
<br />$1,866.52'
<br />100.00
<br />0450
<br />STRUCTURE DEPTH MODIFICATIONS
<br />002
<br />$3,670.10✓LUMPSUM
<br />1.000
<br />$3,670.10
<br />1.000
<br />$3,670.10
<br />1.000
<br />$3,670.10
<br />100.00
<br />0460
<br />NE QUAD STORM REPAIR
<br />002
<br />$1,718.91✓ LUMPSUM
<br />1.000
<br />$1,718.91
<br />1.000
<br />$1,718.91
<br />1.000
<br />$1,718.91
<br />100.00
<br />0470
<br />NW QUAD VAULT REINFORCEMENT
<br />002
<br />$469.29`f LUMPSUM
<br />1.000
<br />$469.29
<br />1.000
<br />$469.29
<br />1.000
<br />$469.29
<br />100.00
<br />0480
<br />STORM VAULT REINFORCEMENT 29TH
<br />002
<br />$5,046.97V LUMPSUM
<br />1.000
<br />$5,046.97
<br />1.000
<br />$5,046.97
<br />1.000
<br />$5,046.97
<br />100.00
<br />0490
<br />CITY ADDED BUSINESS ACCESS SIG
<br />002
<br />$217.16 /LUMPSUM
<br />1.000
<br />$217.16
<br />1.000
<br />$217.16
<br />1.000 I
<br />$217.16
<br />100.00
<br />0500
<br />CHANGE SHALLOW STM PIPE MATERI
<br />002
<br />$593.75, LUMPSUM
<br />1.000
<br />$593.75
<br />1.000
<br />$593.75
<br />1.000
<br />$593.75
<br />100.00
<br />Page 3
<br />City of Eugene
<br />Contract Preliminary Progress Payment
<br />Payment No : 008
<br />Original Contract: $553,004.89
<br />Current Amount: $579,245.78
<br />Contract Award Date: 04/12/2010
<br />Completion Date: 07/31/2010
<br />
|