Trench crossing at lessen: 2 conduits to <br />2ndary /Strongbox: 1 Electrical, 1 Qwest 1 lump ' $ 9,500.00 $ 9,500.00 <br />StrongBox, Pad, + Pedestal + conduits in and out 1 lump $ 5,000.00 S 5,000.00 <br />Total 1 $ 41,200.00 <br />15% Contingency $ 6,180.00 <br />Grand Total Construction $ 47,380.00 <br />Staff design /RFQ draft <br />20 <br />hrs <br />$ <br />86.00 <br />$ <br />1,720.00 <br />Contract writing /completion <br />6 <br />hrs <br />$ <br />86.00 <br />$ <br />516.00 <br />Project management /inspection <br />30 <br />hrs <br />$ <br />86.00 <br />$ <br />2,580.00 <br />10% contingency staff time <br />$ 481.60 <br />Grand Total Staff Time <br />$ 5,297.60 <br />Grand Total Construction <br />$ 47,380.00 <br />Staff Time <br />$ 5,297.60 <br />Grand Total Project <br />$ 52,677.60 <br />Funding <br />$ 37,000.00 <br />