New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4746 PAF
COE
>
PW
>
POS_PWM
>
Capital
>
GJN 4746 PAF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2011 10:11:52 AM
Creation date
3/1/2011 10:11:54 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
Yes
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SYSTEMS: DEVELOPMENT CHARGE EXPENDITURE ALLOCATION WORKSHEET <br />_ <br />Project Name: Bethel Park Master Plan Update <br />Project Manager Name: Emily Proudfoot <br />Service ID # (e.g. Good Job Number 004161): 93- 004746 Contract # (e.g. 2004-0505): Capital Project # (e.g. 905244): <br />`SDCF�rpenditure;Requirements� <br />i moment Fees May be spent only;on capital improVements included in an adopted Capital Improvement Plan that increase de <br />capac�ty�e to <br />senrtce forfutureusers, including those that provide new facilities or increasethe capacity proviiied by existing facilities <br />—. - <br />Date: <br />Wastewater Eligible: Non - assessable components of projects attributable to future development that drain those portions of pipes within the total area served by <br />the project. [Quantify portions of project that a r e capacity enhanci pr - des ign / construction management costs on a proportionate basis] <br />Stormwater Eligible: Non-assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br />the total drainage basin served by the project. [Quantify portions of project that are capacity enhancing by determining the percent of project that will serve new <br />development: The total existing impervious area of basin divided by the future build -out impervious area of basin equals the percent of project serving existing <br />development. Subtract from 100% to derive the pe of project that will serve new deve <br />Transportation Eligible: Non - assessable components attributable to future development of 1) arterial and collector street projects and related traffic signals, and <br />2) off - street bicycle path projects. [Quantify portions of project that are capacity enhancing; pro -rate design /construction management costs on a proportionate <br />basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br />attributed to new development between ye of construction and build out]. <br />Parks Eligible: Components of Neighborhood or Community park projects attributable to future development. [Quantify portions of project that are capacity <br />enhancing versus those portions needed to serve existing users. Pro -rate design /construction management costs on a proportionate basis.] <br />dent Feed May tie spent only on capital Improvements mcluded in an adopted CapitalImprovement Paan; me�ludingthoefo <br />Wastewater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br />Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br />Transportation Eligible: Per Council Resolution No. 4718, reimbursement fees will be budgeted for preservation and maintenance of the existing system <br />(Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed by law). No transportation reimbursement SDC <br />revenue is currentl attributable to off - street bic ycle paths; therefore no rei fee expenditures are a llowed for paths. <br />Parks Eligible: No parks SDC revenue is currently attributable to a reimbursement fee; therefore no reimbursement fee expenditures are allowed. <br />Wastewater Improve. Fee $ % $ % $ % <br />Approved Amounts, if different: <br />$ <br />% <br />$ % $ % <br />l einiburse Fee <br />$ • <br />% <br />$ ! % $zx MIA. x <br />aunts rf tlrfferent <br />u <br />$ t --a <br />o /o $ <br />r? <br />Stormwater Improve. Fee <br />$ <br />% <br />$ % $ % <br />Approved Amounts, if different: <br />$ <br />% <br />$ % $ % <br />teX1 emburse`Fee <br />$ <br />% <br />$ %`g <br />ed`pinounts rfddferent <br />$ <br />% <br />Transportation Improve. Fee <br />$ <br />% <br />$ % $ % <br />Approved Amounts, if different: <br />$ <br />% <br />$ % % <br />bUhts rfddferent: <br />$, <br />a/ <br />$ / $` s' <br />ve Fee - <br />$100,000 <br />100%1$ <br />% $ <br />rfdrfferenk: $ <br />% $ % $ <br />- <br />- � - r <br />e <br />m,�a <br />;..._ x <br />.. <br />gg <br />o}tnts rf tlrfferent <br />°lo $ r x�� <br />Expentl►ture AllpcaLOn Justcaon ;f�� <br />tation That demonstrates justificatjon of <br />SDC funding of this `capital protect at pXO�ect�irtta )ioin�- ptia`se�as�eii a:�t ego <br />tsfoYis of SDC ailocatton amounts/percentag'8s <br />fi <br />' � � � "fi`� � �a �� � �_ ;- <br />� � <br />t � � <br />� � � <br />re an'annual aFCOUntin of SDC ex end�tures <br />✓ g p <br />b �`"" '� `� � <br />y system atthe project level An SDC expen��tare maybe legalty c#ta0el�g� � o <br />IN <br />By <br />- - -- -- <br />! p1(�2d <br />-- - -- <br />Date: <br />—. - <br />Date: <br />Date: <br />P:\POS_Planning \Parks\ Bethel_ Community_Park\2011_Master_Plan_ Revisions \SDC_Alloeation_Form.xlsx Revised March, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.