r) <br />Report ID LBIL1001 <br />Lane County <br />BILLABLE PROJECT COSTS <br />Billable Project Coats for Fiscal Period 201012 Period begins 12A 1/2010 and ends including 12/312010 <br />Project: 36644399 PBM Hilyard St 24-34 (4717) Overhead Rata Applied for this project: Federal (Where applicable) <br />Page No 1 <br />Run hate 02103/2011 <br />Boorman 14.5530 <br />Billed By: 3636213 Materials Testing Proi• 36644399 <br />P4065-Materia1 Investigation <br />TranDate <br />TmnlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remak <br />12/08/2010 <br />EQUIPMENT <br />I TON PASSENGER VAN <br />5 <br />$920 <br />12/08/2010 <br />EQUIPMENT <br />2009 FORD ECONOLINE 12 Puseng <br />4 <br />$636 <br />12/082010 <br />LABOR <br />Engmeenng Teehmemn 2 <br />4 <br />S9256 <br />S12290 <br />FOR SAMPLING <br />12/082010 <br />LABOR <br />Engmeenng Technician 3 <br />5 <br />$131.25 <br />517427 <br />FDR BASE SAMPLING <br />12/09/2010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />2 <br />$3 68 <br />12/092010 <br />EQUIPMENT <br />2009 FORD ECONOLINE 12 Passeng <br />2 <br />$318 <br />12109/2010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />S4629 <br />S6145 <br />FDR SAMPLING <br />12/092010 <br />LABOR <br />Engmccnng Technician 3 <br />2 <br />$5250 <br />S69JI <br />FOR BASE SAMPLING <br />P4065 Totals <br />S 345.01 <br />S 42833 <br />5 77334 <br />P4070-Common soils sampling -toting <br />TrunDate <br />Tornio <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transattion Remark <br />121082010 <br />EQUIPMENT <br />CAT 420D BACKHOE <br />6 <br />$27589 <br />12/08/2010 <br />EQUIPMENT <br />VOLVO 15YD DUMP TRK • VX 3200 6 <br />5221 94 <br />12/0 820 7 0 <br />LABOR <br />Engineering Technician 2 <br />6 <br />$15876 <br />$21080 <br />FDR SAMPLING <br />12/092010 <br />EQUIPMENT <br />CAT 420D BACKHOE <br />3 <br />$13794 <br />12/09/2010 <br />EQUIPMENT <br />VOLVO ISYD DUMP TRK• VX 3200 3 <br />511097 <br />12/092010 <br />LABOR <br />Engineering Technician 2 <br />3 <br />57938 <br />S10540 <br />FDR SAMPLING <br />121102010 <br />LABOR <br />Engineering Tcchmcum 2 <br />2 <br />$5292 <br />$7027 <br />FDR SAMPLING <br />P4070 Totals <br />S 1037.79 <br />S 386.47 <br />S 1424.26 <br />P4080-Sue aggregates glty control <br />TtanDate <br />Trento <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />12/142010 <br />LABOR <br />Engmeenng Assistant <br />4 <br />558.88 <br />$78.18 <br />MIX DESIGN <br />12115/2010 <br />LABOR <br />Engineering Assistant <br />4 <br />$5888 <br />57818 <br />MIXDESIGN <br />12/16/2010 <br />LABOR <br />Engineering Assistant <br />1 <br />$1472 <br />$1955 <br />MIX DESIGN <br />P4980 Totals <br />$ 132AS <br />S 175.91 <br />S 30839 <br />P413S•Mic design <br />TmnDale <br />TmnID <br />Resource Employed <br />Qty <br />Amount <br />Overhand <br />Transaction Remark <br />12/142010 <br />LABOR <br />Sr Engineering Associate <br />3 <br />$9102 <br />$120.86 <br />FDR MIX DESIGN <br />12/15/2010 <br />LABOR <br />Sr Engineering Associate <br />4 <br />S12136 <br />S16114 <br />FOR MIX DESIGN <br />12/228010 <br />LABOR <br />Ss Engmeenng Associate <br />15 <br />S4551 <br />S6043 <br />FDR M IX DESIGN <br />P4135 Totals <br />S 25789 <br />S 342.43 <br />S 60032 <br />3636213 Materials Testin Total 3106.31 <br />