Larry L. Wilson <br />2758 3rd Street <br />Springfield, Or. 97477 <br />541-744-8053 <br />Bill to <br />City of Eugene <br />Public Works Engineering <br />99 East Broadway, Suite 400 <br />Eugene, Or. 97401 <br />Adam Steffen <br />Invoice <br />Date Invoice # <br />1/19/2011 1102 <br />Terms T <br />Project <br />Due within 30 days <br />Delta Ponds Trail Preconstr. <br />Contract No. 2011-00212 <br />Quantity <br />Description <br />Rate <br />Amount <br />45 <br />Work included locating a segment of the proposed trail route, <br />$35.00 <br />$1,575.00 <br />stationing the proposed alinement on the recently constructed <br />bench and suveying a segment of the route not on the bench. <br />Work also included furnishing special drawings and documentation <br />of details needed to assemble an engineering packet. <br />1 <br />Survey stakes and equipment rental of a surveyors level. <br />$77.27 <br />$77.27 <br />Thanks <br />Larry 531- q3 3z --b1~3q- q1 <br />92 <br />, <br />I U 105u0 <br />f <br />W <br />lie <br />r 0" t or NO <br />o <br />approve this f nt <br />, <br />r _ <br />Ignahtre~ates <br />This invoice complete tasks 1 through 3 on the scope of work order. <br />Total $1,652.27 <br />