`a- <br />Report ID: LBILL001 <br />Lane County <br />BILLABLE PROJECT COSTS <br />Billable Project Costs for Fiscal Period 2010.12 Period begins 12/01/2010 and ends including 12/31/2010 <br />Project: 36644029 PBM W. 18th Ave (4584) Overhead Rates Applied for this project: Federal (Where applicable) <br />Page No. 1 <br />Run Date 02/03/2011 <br />Run Time 14:52:25 <br />Billed BY: 3636213 Materials Testine Proi: 36644029 <br />P4090-PCC quality control <br />TranDate <br />TranID <br />1210612010 <br />EQUIPMENT <br />12/06/2010 <br />LABOR <br />12/06/2010 <br />LABOR <br />Resource Employed <br />I TON PASSENGER VAN <br />Engineering Assistant <br />Engineering Technician 2 <br />P4090 Totals <br />Qty Amount <br />Overhead <br />Transaction Remark <br />1 $1.84 <br />1 S14.72 <br />519.55 <br />PCC TESTING ` <br />1 526.46 <br />$35.13 <br />SUAIR/CYL <br />S 43.02 <br />$ 54.68 <br />S 97.70 <br />3636213 Materials Testine Total S 97.7Q <br />36644029 Project Grand Total S 97.70 <br />