Alton Baker(Park Lot 8 Access Road relocation <br />Job #4612 <br />Good Job number estimate`. <br />12/22/2008 <br />E <br />Item <br />Unit <br />Qty <br />Unit Cost <br />Total <br />Site Survey <br />1 <br />Is <br />$ 3,500.00 <br />3,500,00 1 <br />Design, bid, project mngmt <br />50 <br />h,r. <br />$ 100.00 <br />$ 5,000.00 i. <br />Demolition <br />1 <br />Is <br />$ 6,500:00 <br />$ 6,500.00 " . <br />Excavation <br />,1 - <br />Is <br />$ 5,000.00 <br />' $ 5,000.00 <br />Concrete sidewalk/apron <br />200 <br />s.f. <br />$ 7.50 <br />1,500.00 <br />:Gravel base <br />1000 <br />s:f. <br />$ 2.50 <br />$ 2,500.00 <br />Paving <br />1000. <br />s.f. <br />$ .4.00 <br />$ 4;000.00 <br />Subtotal <br />$28,000.00` <br />10% Contingency <br />$ 2,800.00 <br />Grand total <br />$ 30,800.00 <br />t <br />r <br />j . <br />- j <br />- i <br />i <br />1 <br />l <br />i <br />I <br />L <br />