New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
975232 Pivot Batched Inv
COE
>
PW
>
POS_PWM
>
AP
>
975232 Pivot Batched Inv
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 8:23:35 PM
Creation date
2/7/2011 9:03:45 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GL_Project_Number
975232
Identification_Number
2011003217
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
November 30, 2007 <br />Jon Lauch <br />Eugene School District 4J <br />200 North Monroe Street <br />Eugene, OR 97402-4295 <br />Oa r+ pa 1 c) <br />13B <br />I-ZG-~1 <br />Subject: Eugene School District 4J / City of Eugene <br />Jefferson and Spencer Butte Middle School Athletic Fields <br />Phase 2 <br />Proposal for Architectural and Engineering Services <br />Dear Mr Lauch, <br />PIVOT Architecture is pleased to continue our work on the middle school athletic field project. At the <br />conclusion of the work of Phase 1/1A, the selected site locations for two new fields are Spencer Butte and <br />Jefferson. This proposal is. for the A and E services to complete the design, bid/procure the work, and <br />construction administration services. <br />Project Overview <br />The preferred locations of the fields are: <br />Jefferson, Option C <br />■ 68 yard field <br />■ 6 or 8 lane metric track as an additive alternate <br />■ E-W field orientation <br />■ Locate near existing buildings (displaces existing track and natural turf field) <br />■ Provide new paths to existing ROW and/or parking lot <br />■ Provide four pole field lighting system <br />Spencer Butte, Option A <br />■ 68 yard field <br />■ No track <br />■ E-W field orientation <br />■ Locate on middle terrace, east of existing track (do not modify existing track) <br />■ Provide new paths to existing pavement <br />■ Provide four pole field lighting system <br />The project will begin with an abbreviated DD phase. The purpose of the phase is to confirm the scope of work <br />for the improvements. The Construction Documents phase will include a separate procurement package to select <br />the synthetic turf system through an RFP process. The selected turf system will procured and installed separately, <br />but concurrently from the remainder of the work. <br />The intent of the DD phase is to evaluate and resolve the following issues: <br />
The URL can be used to link to this page
Your browser does not support the video tag.