0 0 <br />GREEN Karleen M <br />From: <br />ELLIOTT Brian N <br />Sent: <br />Tuesday, August 26, 2008 12:34 PM <br />To: <br />GREEN Karleen M <br />Subject: <br />FK Amazon 1135 Low Flow Structure Costs <br />Hey Karleen, <br />Here is the acct. code and the good job numbers Trevor sent me (below) <br />Thanks, <br />Brian <br />From: TAYLOR Trevor H <br />Sent: Thursday, August 14, 2008 4:45 PM <br />To: ELLIOTT Brian N <br />Cc: MULLEN Lauri H; WOLD Eric N <br />Subject: RE: Amazon 1135 Low Flow Structure Costs <br />Brian, <br />Excellent. Thanks for this summary and cost estimates. Go ahead and schedule all of the items below. You <br />can charge them all to Good Job Number 3531 (Lower Amazon Creek Restoration Section 1135(B)) also known <br />as account number 531-9335-975056 activity code„- I would like to have the concrete weir work and our <br />scoping work for the vinyl sheet work completed by September 20th if possible. <br />Thanks much. <br />Trevor Taylor <br />un -:~s`1 <br />Natural Area Restoration Team Supervisor <br />Parks and Open Space Division <br />Eugene, Oregon <br />541.682.4888 <br />From: ELLIOTT Brian N <br />Sent: Thursday, August 14, 2008 3:48 PM <br />To: TAYLOR Trevor H <br />Cc: MULLEN Lauri H <br />Subject: Amazon 1135 Low Flow Structure Costs <br />Trevor, <br />I have obtained some cost estimates on services and materials for the Amazon Creek concrete weir retrofit <br />and the Diversion Channel retention structure as follows: <br />Amazon Creek Concrete Weir <br />Ground penetrating radar to locate steel rebar: <br />-Scan 8 areas for rebar location in both vertical and horizontal position. Provide with template or place steel <br />pin at center of location to drill. <br />Est. $1100.00 Provider: GPR Data LLC - Eugene, OR <br />Concrete Core Drilling: <br />- Increase the two existing 4" diameter holes to 6" diameter and core drill two additional 6" diameter holes. <br />Est. $500.00 to $700.00 Provider: Empire Concrete Cutting, Inc. - Springfield, OR <br />