New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
965262 University Park Land Exchange GJN 4416 PAF (2)
COE
>
PW
>
POS_PWM
>
Capital
>
965262 University Park Land Exchange GJN 4416 PAF (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2011 6:39:12 AM
Creation date
1/26/2011 2:45:47 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
Yes
External_View
No
GJN
4416
GL_Project_Number
965262
Document_Number
965262
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTIO:0OST ESTIMATE <br />City of Eugene Parks Planning <br />PROJECT: West University Park <br />NOTE: cost figures reflect contracted <br />CAP. PROJ. <br />construction, and require further design <br />DATE: 4.21.06 <br />development, detail and contractor quotes for <br />PM: Hostick <br />accurate estimates. In-kind donations, staff <br />assistance or completion, and volunteer efforts <br />will result in different costs. <br />Cost Summa <br />Contracted Construction <br />Demolition <br />$0 Quinney <br />Irrigated Turf <br />$27,700 <br />ROW Improvements <br />$0 Later <br />Subtotal $27,700 <br />Construction Contingency 10.0% $2,770 <br />Total estimated Construction Cost $30,470 <br />Materials, Labor & Equipment <br />Subtotal <br />Item <br />Quantity Units <br />Cost <br />Mtrl & Labor <br />Comments <br />e e • <br />Remove and haul brick walks, walls, and other hard surf <br />2,500 <br />sf <br />2.00 <br />$5,000 <br />Remove and haul excess soil - level site <br />75 <br />cy <br />15.00 <br />$1,125 <br />Remove trees and other vegetation <br />1 <br />sum <br />3,000.00 <br />$3,000 <br />Remove brick sidewalk <br />600 <br />sf <br />2.00 <br />$1,260 <br />Remove sidewalk E of brick <br />600 <br />sf <br />2.00 <br />$1,200 <br />optional <br />Remove curb/gutter ® 2 locations <br />2 <br />ea <br />250.00 <br />$500 <br />optional <br />Mobilization <br />1 <br />sum <br />1,000.00 <br />$1,000 <br />optional <br />Selvage fence and other items - deliver to City and <br />1 <br />sum <br />1,000.00 <br />$1,000 <br />Total <br />$14,025 <br />IRRIGATED TURF' <br />Import soil to Ouinney property <br />200 <br />cy <br />20.00 <br />$4,000 <br />Deep till and amend soil - entire site <br />13,000 <br />sf <br />0.75 <br />$9,750 <br />Seed entire site <br />13,000 <br />sf <br />0.15 <br />$1,950 <br />Subtotal <br />$15,700 <br />Irrigation installed <br />13,000 <br />sf <br />0.50 <br />$6,500 <br />Irrigation control equipment <br />1 <br />sum <br />4,000.00 <br />$4,000 <br />Water meter and connection <br />1 <br />sum <br />1,500.00 <br />$1,500 <br />Subtotal <br />$12,000 <br />Total <br />$27,700 <br />ROW loll provemen ts <br />Reconstruct sidewalk on 14th Ave <br />1200 <br />sf 5.50 <br />$6,600 optional <br />Curb and gutter <br />40 <br />If 18.00 <br />$720 optional <br />Rehab and seed planter strip <br />1500 <br />sf 2.00 <br />$3,000 optional <br />Total <br />3 <br />ea <br />$10,320 <br />'Assuming water SDC's for existing park are credited to future park <br />
The URL can be used to link to this page
Your browser does not support the video tag.