VIGIL-, AGRIMIS <br />nesig~ proless,en <br />tel 503-274-2010 <br />fax: 503-274-2024 <br />email kwgd@vigd-agnmis com <br />TRANSMITTAL <br />DATE: January 6, 2011 <br />TO: Terry Colvin <br />FIRM: City of Eugene <br />ADDRESS: 99 E. Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />FROM: Ken Vigil <br />PROJECT: Bridge Willamette River Bank Stability Study Fixed Term <br />COMMENTS: <br />Terry, <br />Enclosed is Invoice 4105 for work performed through the end of December 2010. <br />Thanks, <br />Ken <br />JAN 10 2011 <br />819 SE Morrison Street, Su to 310 <br />Portland, Oregon 97214 <br />