Lane County <br />Report ID: LBILL001 BILLABLE PROJECT COSTS Page No. I <br />Run Date 01/0512011 <br />Run Time 15:24:27 <br />Billable Project Costs for Fiscal Period 2010-11 Period begins 11/01/2010 and ends including 11/30/2010 <br />Project: 36644339 EU G Lab (4xxx) Overhead Rates Applied for this project: Federal (Where applicable) <br />Billed BY: 3636213 Materials Testing Proj: 36644339 <br />P4080-Base aggregates glty control <br />TranDaic TranlD Resource Employed Qry Amount Overhead Transaction Remark <br />10/2112010 EQUIPMENT SUBUR 3/4T 4X4-Phoenix 1.3 $2.76 <br />10/21/2010 LABOR Engineering Technician 2 1.5 $34.71 $46.09 AGG TESTING <br />P4080 Totals S 37.47 S 46.09 S 33.56 <br />3636213 Materials Testing Total $ 83.56 <br />36644339 Project Grand Total $ 83.56 <br />