1.• }~a~ges . cunt <br />2991 1"biia" Creech[ Rb. <br />Shaby Cave, Or. 97f39 <br />C CB#1 04797 <br />V-040870-2746 f(W)S78-7022 cell (541)84a-4946 <br />Invoice <br />DATE <br />INVOICE # <br />11/1/2008 <br />2 <br />BILL TO <br />City of Eugene Oregon <br />Parks and Open Space <br />1820 Roosevelt Blvd <br />Eugene, OR 97402 <br />REMIT TO <br />CONTRACT NO. <br />PROJECT <br />2009-05317 <br />QUANTITY <br />DESCRIPTION <br />RATE <br />AMOUNT- <br />1,689 <br />MtBaldy clearing &,grubbing <br />1.00 <br />00 <br />2 <br />1,689.00 <br />4,474.00 <br />2,237 <br />22 <br />Mt Baldy Excavation <br />Mt Baldy Rolling Dips <br />. <br />25.00 <br />550.00 <br />1 <br />Mt Baldy Switchback <br />400.00 <br />200.00 <br />1 <br />400.00 <br />1,200.00 <br />1 <br />1,068 <br />Mt Baldy Log Barrier <br />Mt Baldy Restoration <br />, <br />2.00 <br />00 <br />2 <br />2,136.00 <br />2,162.00 <br />1,081 <br />1 <br />Mt Baldy Obliteration <br />Mt Baldy Removal of Structures <br />. <br />300.00 <br />300.00 <br />cnR.~' Zoo - 0 S 3 ► 0 <br />6 " r'), <br />pA'I <br />IA <br />5 11 57 <br />C)C <br />O <br />I <br />Total $12,911.00 <br />