Report ID. LBILL001 <br />Lam County <br />BILLABLE PROJECT COSTS <br />Page No 2 <br />Run Date 01/052011 <br />Run Time 15,25 13 <br />Billable Pm/em Costs for Fiscal Period 2010-11 Period begins 11/012010 and ends including 11/302010 <br />Project: 36644349 Green Acres Rd (4702) Overhead Rates Applied for this project: Friend (When applicable) <br />10262010 LABOR Supersnamg Engineering Assoc 2 5 S89 55 $11890 2 BASE DESIGNS <br />P4065 Totals S1 120534 L 144336,1 S 2648.80 <br />3636213 Materials Testing Total <br />S 3001.93 <br />Billed By- 3636903 Traffic En¢Ineerine Proi- 36644349 <br />P4040-Trenic studies <br />TranDate T=ID <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transition Remark <br />10212010 EQUIPMENT <br />FORD 20053/4 TN PU F250-VX <br />1 <br />$229 <br />10/212010 LABOR <br />Engineering Technician l <br />6 <br />J $13344 <br />$19999 <br />TRAFFIC CLASSIFICATION STUDY <br />P4040 Totals <br />$J 135.73 <br />S-/199.99 <br />S J 335.72 <br />P4045-Speed aaning rtudm. <br />TmnDam TmnlD <br />Rcaaurce Employed <br />Qry <br />Amount <br />Overhead <br />Transaction Remark <br />10212010 LABOR <br />Engineering Technuun 2 <br />2 <br />j S52 92 <br />S7931 <br />RETRIEVE TUBES FROM ROAD <br />P4045 Tomb <br />$ J 52.92 <br />SJ 7931 <br />9) 13233 <br />3636903 Traffic En ineerin Total 467,95 <br />36644349 Proiect Grand Total S J 3543 00 <br />s <br />z <br />z <br />M <br />. <br />