Run Date: 01/11/2011 14:15:12 <br />Contractor: BABB CONSTRUCTION <br />Job #: 93- 004546 <br />Contract No: 2009 -00030 <br />PO #: 2010100033 <br />Assessable: Yes <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 018 <br />Original Contract: $2,120,407.20 <br />Current Amount: $2,270,643.35 <br />Contract Award Date: 07/02/2009 <br />Completion Date: 10/20/2010 <br />Current Contract <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity <br />Cumulative Totals <br />Amount Quantity <br />Page 7 <br />% Complete <br />0789 <br />RE -EXCAV INTERSECTION OF CREST <br />014 <br />$3,232.14 <br />LUMPSUM <br />1.000 <br />$3,232.14 <br />0.000 <br />$0.00 <br />1.000 <br />$3,232.14 <br />100.00 <br />0790 <br />TEMPORARY TYPE ORANGE PLASTIC <br />$1.50 <br />FOOT <br />1,233.000 <br />$1,849.50 <br />0.000 <br />$0.00 <br />738.000 <br />$1,107.00 <br />60.00 <br />0800 <br />SUBGRADE GEOTEXTILE <br />$0.80 <br />SQYD <br />27,630.000 <br />$22,104.00 <br />0.000 <br />$0.00 <br />20,146.300 <br />$16,117.04 <br />73.00 <br />0810 <br />REMOVE 12" PIPE <br />$40.00 <br />FOOT <br />55.000 <br />$2,200.00 <br />0.000 <br />$0.00 <br />486.000 <br />$19,440.00 <br />884.00 <br />0811 <br />INST TEMP STM PIPE STA 18 +20 -1 <br />009 <br />$662.90 <br />LUMPSUM <br />1.000 <br />$662.90 <br />0.000 <br />$0.00 <br />1.000 <br />$662.90 <br />100.00 <br />0812 <br />INSTALL TEMP STM PIPE STA 19 +2 <br />010 <br />$747.70 <br />LUMPSUM <br />1.000 <br />$747.70 <br />0.000 <br />$0.00 <br />1.000 <br />$747.70 <br />100.00 <br />0813 <br />INSTALL 4" PERF PIPE /W ROCK /FI <br />010 <br />$2,200.09 <br />LUMPSUM <br />1.000 <br />$2,200.09 <br />0.000 <br />$0.00 <br />1.000 <br />$2,200.09 <br />100.00 <br />0814 <br />DRAINAGE ISSUES -FRIENDLY (6 /22/ <br />014 <br />$1,394.39 <br />LUMPSUM <br />1.000 <br />$1,394.39 <br />0.000 <br />$0.00 <br />1.000 <br />$1,394.39 <br />100.00 <br />0815 <br />ADDITIONAL ROCK FOR PERM. EROS <br />016 <br />$196.37 <br />LUMPSUM <br />1.000 <br />$196.37 <br />0.000 <br />$0.00 <br />1.000 <br />$196.37 <br />100.00 <br />0816 <br />PLACE ROUND ROCK IN VARIOUS LO <br />019 <br />$1,534.34 <br />LUMPSUM <br />1.000 <br />$1,534.34 <br />1.000 <br />$1,534.34 <br />1.000 <br />$1,534.34 <br />100.00 <br />0820 <br />4" STORMWATER PERF PIPE (WRAPP <br />$2.00 <br />FOOT <br />1,307.000 <br />$2,614.00 <br />0.000 <br />$0.00 <br />3,419.500 <br />$6,839.00 <br />262.00 <br />0825 <br />LOWER /RE- INSTALL 6" C -900 FROM <br />012 <br />$971.11 <br />LUMPSUM <br />1.000 <br />$971.11 <br />0.000 <br />$0.00 <br />1.000 <br />$971.11 <br />100.00 <br />0830 <br />10 INCH PVC STORM PIPE <br />$27.00 <br />FOOT <br />741.000 <br />$20,007.00 <br />0.000 <br />$0.00 <br />533.900 <br />$14,415.30 <br />72.00 <br />0831 <br />INSTALL 10" C -900 PIPE SW CORN <br />Oil <br />$1,920.38 <br />LUMPSUM <br />1.000 <br />$1,920.38 <br />0.000 <br />$0.00 <br />1.000 <br />$1,920.38 <br />100.00 <br />0832 <br />INSTALL 10" CULVERT TO DI 8506 <br />012 <br />$1,492.82 <br />LUMPSUM <br />1.000 <br />$1,492.82 <br />0.000 <br />$0.00 <br />1.000 <br />$1,492.82 <br />100.00 <br />0833 <br />INSTALL 3 AREA DRAINS AND CONN <br />012 <br />$4,155.22 <br />LUMPSUM <br />1.000 <br />$4,155.22 <br />0.000 <br />$0.00 <br />1.000 <br />$4,155.22 <br />100.00 <br />0834 <br />INSTALL TEE EXISTING STM /10" P <br />015 <br />$813.08 <br />LUMPSUM <br />1.000 <br />$813.08 <br />0.000 <br />$0.00 <br />1.000 <br />$813.08 <br />100.00 <br />0840 <br />12 INCH PVC STORM PIPE <br />$33.50 <br />FOOT <br />5,900.000 <br />$197,650.00 <br />0.000 <br />$0.00 <br />5,384.400 <br />$180,377.40 <br />91.00 <br />0841 <br />12" C -900 FROM CB70092 -SDMH 85 <br />011 <br />$2,416.41 <br />LUMPSUM <br />1.000 <br />$2,416.41 <br />0.000 <br />$0.00 <br />1.000 <br />$2,416.41 <br />100.00 <br />0850 <br />15 INCH PVC STORM PIPE <br />$36.00 <br />FOOT <br />345.000 <br />$12,420.00 <br />0.000 <br />$0.00 <br />342.900 <br />$12,344.40 <br />99.00 <br />0860 <br />15 INCH REINFORCED CONCRETE PI <br />$48.00 <br />FOOT <br />24.000 <br />$1,152.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0865 <br />21" PVC CONNECTION TO EXISTING <br />011 <br />$3,790.53 <br />LUMPSUM <br />1.000 <br />$3,790.53 <br />0.000 <br />$0.00 <br />1.000 <br />$3,790.53 <br />100.00 <br />0870 <br />VIDEO INSPECTION <br />$1.00 <br />FOOT <br />7,010.000 <br />$7,010.00 <br />0.000 <br />$0.00 <br />6,178.600 <br />$6,178.60 <br />88.00 <br />0880 <br />CONCRETE STORM DRAIN MANHOLES <br />$2,200.00 <br />EACH <br />49.000 <br />$107,800.00 <br />0.000 <br />$0.00 <br />48.000 <br />$105,600.00 <br />98.00 <br />Estimated Payment <br />Amount Quantity <br />Amount <br />