Run Date; 01/06/2011 14:53:11 <br />Contractor: KNIFE RIVER <br />Job 93-004614 <br />Contract No: 2010-00012 <br />PO 2010100223 <br />Assessable: No <br />Line Description Last Chng Or <br />Current Contract <br />Unit Price Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity <br />Page 5 <br />& Complete <br />0580 <br />COLD PLANE PVMT REMOVAL, 3" DE <br />$0.27 <br />SQFT <br />31,150.000 <br />$8,410.50 <br />0.000 <br />$0.00 <br />29,766.500 <br />$8,036.96 <br />96.00 <br />0590 <br />COLD PLANE PVMT REMOVAL, 4" DE <br />$0.28 <br />SQFT <br />51,000.000 <br />$14,280.00 <br />0.000 <br />$0.00 <br />50,502.000 <br />$14,140.56 <br />99.00 <br />0600 <br />LEVEL 3, 1/2" DENSE WMAC <br />$52.50 <br />TON <br />5,000.000 <br />$262,500.00 <br />0.000 <br />$0.00 <br />5,233.770 <br />$274,772.93 M <br />105.00 <br />0601 <br />ASPHALT ESCALATION MAY-(JOB #4 <br />004 <br />$1.52 <br />TON <br />183.850 <br />$279.45 <br />0.000 <br />$0.00 <br />183.850 <br />$279.45 <br />100.00 <br />0602 <br />ASPHALT ESCALATION JUNE-(JOB # <br />004 <br />$0.86 <br />TON <br />1,638.600 <br />$1,409.20 <br />0.000 <br />$0.00 <br />1,638.600 <br />$1,409.20 <br />100.00 <br />0603 <br />ASPHALT ESCALATION JULY(JOB #4 <br />005 <br />$0.80 <br />TON <br />3,099.660 <br />$2,479.73 <br />0.000 <br />$0.00 <br />3,411.320 <br />$2,729.06 <br />110.00 <br />0610 <br />PLAIN CONCRETE PVMT, DOWELED, <br />$7.00 <br />SQFT <br />3,420.000 <br />$23,940.00 <br />0.000 <br />$0.00 <br />3,316.530 <br />$23,215.71 <br />97.00 <br />0620 <br />STANDARD CONCRETE CURBS <br />$19.00 <br />FOOT <br />116.000 <br />$2,204.00 <br />0.000 <br />$0.00 <br />103.300 <br />$1,962.70 <br />89.00 <br />0630 <br />CONCRETE CURB AND GUTTER <br />$33.00 <br />FOOT <br />112.000 <br />$3,696.00 <br />0.000 <br />$0.00 <br />352.200 <br />$11,622.60 <br />314.00 <br />0640 <br />CONCRETE WALKS, 4" THICK <br />$11.50 <br />SQFT <br />1,680.000 <br />$19,320.00 <br />0.000 <br />$0.00 <br />1,582.150 <br />$18,194.73 <br />94.00 <br />0641 <br />4" VARIABLE HEIGHT CONCRETE CU <br />006 <br />$296.73 <br />LUMPSUM <br />1.000 <br />$296.73 <br />1.000 <br />$296.73 <br />1.000 <br />$296.73 <br />100.00 <br />0650 <br />TRUNCATED DOME TEXTURING-BLACK <br />$20.00 <br />SQFT <br />96.000 <br />$1,920.00 <br />0.000 <br />$0.00 <br />94.000 <br />$1,880.00 <br />98.00 <br />0660 <br />CONCRETE GRINDING <br />$25.00 <br />SQFT <br />10.000 <br />$250.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0670 <br />PVMT LEGEND, TYPE B: ARROWS <br />$260.00 <br />EACH <br />23.000 <br />$5,980.00 <br />0.000 <br />$0.00 <br />23.000 <br />$5,980-00 <br />100.00 <br />0680 <br />PVMT LEGEND, TYPE B: BICYCLE L <br />$260.00 <br />EACH <br />18.000 <br />,$4,680.00 <br />0.000 <br />$0.00 <br />18.000 <br />$4,680.00 <br />100.00 <br />0690 <br />PVMT LEGEND, TYPE B: RR CROSSI <br />$1,100.00 <br />EACH <br />2.000 <br />$2,200.00 <br />0.000 <br />$0.00 <br />2.000 <br />$2,200.00 <br />100.00 <br />0700 <br />PVMT LINE, TYPE B: PARKING TEE <br />$25.00 <br />SQFT <br />110.000 <br />$2,750.00 <br />0.000 <br />$0.00 <br />150.800 <br />$3,770.00 <br />137.00 <br />0710 <br />PVMT LINE, TYPE B <br />$8.00 <br />SQFT <br />1,800.000 <br />$14,400.00 <br />0.000 <br />$0.00 <br />1,236.800 <br />$9,894.40 <br />69.00 <br />0720 <br />MONO-DIRECTIONAL CRYSTAL TYPE <br />$4.00 <br />EACH <br />144.000 <br />$576.00 <br />0.000 <br />$0.00 <br />122.000 <br />$488.00 <br />85.00 <br />0730 <br />BI-DIRECTIONAL YELLOW TYPE I M <br />$4.00 <br />EACH <br />30.000 <br />$120.00 <br />0.000 <br />$0.00 <br />32.000 <br />$128.00 <br />107.00 <br />0740 <br />LOOP DETECTORS INSTALLATION <br />$650.00 <br />EACH <br />12.000 <br />$7,800.00 <br />0.000 <br />$0.00 <br />12.000 <br />$7,800.00 <br />100.00 <br />0750 <br />THERMOPLASTIC, NON-PROFILE, 90 <br />$13,000.00 <br />LUMPSUM <br />1.000 <br />$13,000.00 <br />0.000 <br />$0.00 <br />1.000 <br />$13,000.00 <br />100.00 <br />0760 <br />REMOVE AND REPLACE SIGN <br />$360.00 <br />EACH <br />1.000 <br />$360.00 <br />0.000 <br />$0.00 <br />1.000 <br />$360.00 <br />100.00 <br />0770 <br />ADJUST JUNCTION BOX <br />$300.00 <br />EACH <br />3.000 <br />$900.00 <br />0.000 <br />$0.00 <br />2.000 <br />$600.00 <br />67.00 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 009 <br />Original Contract: $1,916,616.00 <br />Current Amount: $1,960,188.07 <br />Contract Award Date: 01/13/2010 <br />Completion Date: 06/30/2010 <br />Amount <br />