t <br />Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />ISAI1 AR7-5701 <br />DATE <br />CONTRACT NO. <br />6/1/2010 <br />2010-16 <br />PROJECT NAME <br />JOB NO. <br />Rehab of Runway 16R/34L <br />4625 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />Wildish Construction <br />341-0018-45 <br />INSPECTOR <br />PHONE NUMBER <br />DATE OF AWARD <br />Daniel Durazo <br />541-682-2680 <br />March 19,2010 <br />FIRST NOTIFICATION <br />June 01,2010 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) C <br />Inspector Signature <br />THIRD NOTIFICATION K1 ~ L ~o:a ~ t X ~L „ IZ, t,5 l S ~ <br />r-l- <br />-A <br />A <br />- <br />S <br />C <br />r <br />P <br />p <br />) <br />-x <br />Notice of Completion. Begin Warranty Period. LS <br />AL-L- I.vu21L <br />IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK <br />EQUIPMENT AND <br />, <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENTS, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR <br />. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br />WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY PERIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />Inspector Signature <br />Engineer: <br />Address: <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construc o Manager File .-G' <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />--41e&^ Surety PW Administration -R4-€agiaeering- PW E As Construct Monitor MADD Supervisor Inspector <br />Q:\PROJECTS\PROJ-5\4625 RW Overlay\Correspondence\Contractors\First Notification_4625_20100601.doc March 2009 <br />