Notification of Commencement and <br />Completion Dates for Contract Projects <br />ro-N `Iw~j Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />MA 1 \ L247 C7A4 <br />DATE <br />1/5/2011 <br />..1 - - . <br />CONTRACT NO. <br />2011-502 <br />PROJECT NAME <br />JOB NO <br />Agate St and E 13"' Ave Pedestrian Crossing U of 0 Basketball Arena Complex <br />. <br />4706 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />Brown Contracting, Inc. <br />N/A <br />INSPECTOR <br /> <br />PHONE NUMBER <br />DATE OF AWARD <br />Keith Jurasevich <br />55441-682-5247 <br />7/19/2010 <br />FIRST NOTIFICATION <br />8/0212010 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />10/22/2010 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />1/5/2011 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK <br />EQUIPMENT AND <br />, <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENTS, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR <br />. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br />WITHIN THE ONE-YEAR WARRANTY PERIOD. 'REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY PERIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />p <br />' Inspec r ignature <br />For Privately Engineered Projects Only <br />Engineer: Balzhiser & Hubbard Engineers <br />Address: 100 W 13`h Avenue <br />Eugene OR 97401 <br />Owner: University of Oregon, C/O Craig McVicker <br />Address: 1776 E 13`h Avenue <br />Eugene OR 97403 <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Ma ag File Ginger Perales, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />Q:\PROJECTS\PROJ-6\4706 Agate&13thCrossings.UOArenaMitigation\CORRESPONDENCE\Contractors\4706-20110105 kmj Third NmAmIloasdoc <br />