Native & Urban <br />Gardens inc. <br />Bill to: <br />Ryan Turner <br />Waterways Maintenance <br />Natural Resources <br />City of Eugene <br />2©I <br />CO JF January 4, 2011 <br />w <br />G1 <br />Work order #4 ACE widening (north of Wallis St) to <br />Bertelsen, both sides. <br />Blackberry removal @$35.00 / Hr. as agreed, 10.5 Hours. <br />$367.50 <br />910 linear feet willow cuttings planted; ACE widening to <br />W. 11 north bank. <br />As bid $140.00 /100 linear feet. 9.10x$140.00 <br />$1274.00 <br />930 linear feet willow cuttings planted; ACE widening to <br />W. 11 south bank.. <br />As bid $140.001100 linear feet. 9.30 x $140.00 <br />$1302.00 <br />940 linear feet willow cuttings planted; W. 11 to <br />Bertelsen north -east bank. <br />As bid $140.00/100 linear feet. 9.40 x $140.00 <br />$1316.00 <br />988 linear feet willow cuttings planted; W. 11 to <br />Bertelsen south -west bank. <br />As bid $140.00/100 linear feet. 9.88 x $140.00 <br />$1383.20 <br />Total due: I $5642.70 <br />310 E. 41 ST AVE. EUGENE, OR 97405 <br />O.L.B.L. #6262 O.I.C.L. #12114 BONDED AND INSURED <br />