;o V <br />STREET LIGHT CONSTRUCTION NOTICE <br />AGENCY: City Of Eugene. <br />EWEB DRAWING A-26135 <br />EWES MAP E-17N <br />DATE: December 16, 2010 <br />City of Eugene-PWM (Maintenance) ❑ <br />City of Eugene-PWE (Capital) <br />The Eugene Water & Electric Board contemplates equipment changes or additions that will affect your <br />street light equipment. These plans are outlined below and shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS W <br />EWEB to install #6 D..P to new city traffic control device @ intersection o#.~amber" City View <br />Developer's Name: Eugene Water & Electric Board <br />Telephone <br />COE Reps Name: Prepared By: Karen Demmers <br />Telephone Telephone 541-685-7170 <br />PO G J N ,5x <br />REPLY <br />Eugene Water & Electric Board <br />Attention: Administrative Assistant, Distribution Engineering . <br />1. Connect (high pressure sodium) street lights as per attached drawing and bill $/month as per <br />EWEB J-4 street light schedule. <br />2. This company (will/will not) be interested in this ditch for joint use. <br />3. This company (will/will not) be interested in this pole(s) for joint use. <br />Preliminary billing is as follows: <br />EWEB to bill: for the following work: <br />Ditch: $ <br />Duct: $ <br />Other: travel $ 104.00 <br />Transfer: $ <br />New Installation:Conductor for traffic control device $ 275.00 <br />Total: $ 379.00 <br />Agency: Authorized By: <br />Eugene Water & Electric Board: <br />Authorized By: Date: <br />12/13/10 <br />