New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 004546 Inv 3372 LCPW
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2011
>
GJN 004546 Inv 3372 LCPW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 4:14:45 PM
Creation date
12/27/2010 2:45:29 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004546
GL_Project_Number
985374
Identification_Number
2011008562
COE_Contract_Number
2010-00202
Document_Number
3372
Retention_Destruction_Date
6/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lane County <br />Report ID. LBILL001 BILLABLE PROJECT COSTS Page No I <br />Run Date 11/242010 <br />Run Timc 09:48:28 <br />Billable Project Cons for Fiscal Period 2010 -10 Period begin 10/01/2010 and ends including ]Ol3112010 <br />Project: 36644369Crest /Story Phase 2 (4546) Overhead Rates Applied for this project: Federal (Where applicable) <br />Billed By 3636213MaterialsTesting Proi:36644369 <br />P1095Smadby time <br />TranDate <br />TraND <br />Resomce Employed <br />Qty <br />Amount <br />09/30/2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />1 <br />S1.84 <br />1 09/30/2010 <br />LABOR <br />Engineering Assistant <br />1 <br />$14.72 <br />09/30/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />523.14 <br />10/05/2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4- Phoenix <br />1 <br />$1.84 <br />, 10/05/2010 <br />LABOR <br />Engineering Assistant <br />1 <br />$14.72 <br />10/05/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />523.14 <br />\IOtOW2010 <br />EQUIPMENT <br />SUBUR 3 /474X4- Phoenix <br />1 <br />$1.84 <br />10/06/2010 <br />LABOR <br />Engineering Assistant <br />1 <br />S14.72 <br />10106/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />\09242010 <br />LABOR <br />P1095Totals <br />0.5 <br />S 119.10 <br />P4090•PCC quaaty, control <br />TmnDate <br />TranlD <br />Renounce Employed <br />Qty <br />Amount <br />\ 09202010 <br />EQUIPMENT <br />SUBUR 3 /474X4-Phoenix <br />2 <br />53.68 <br />j� 09/2012010 <br />LABOR <br />Engineering Assistant <br />2 <br />S29.44 <br />`09/20/2010 <br />LABOR <br />Engineering Assistant <br />0.5 <br />$7.36 <br />09/212010 <br />EQUIPMENT <br />FORD RANGER PU 2WD <br />2 <br />53.88 <br />-- '09212010 <br />LABOR <br />Engineering Assistant <br />2 <br />S29.44 <br />0921/2010 <br />LABOR <br />Engineering Assistant <br />0.5 <br />$7.36 <br />09222010 <br />EQUIPMENT <br />SUBUR3 /4T4X4- Phoenix <br />2 <br />$3.68 <br />1 09/22/2010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />546.29 <br />0924/2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4 - Phoenix <br />2 <br />$3.68 <br />\09242010 <br />LABOR <br />Engineering Assistant <br />0.5 <br />8736 <br />0912412010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />$4618 <br />. 09/2R2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4- Phoenix <br />1 <br />$1.84 <br />\\09292010 <br />LABOR <br />Engineering Assistant <br />2 <br />$29.44 <br />`09/282010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$23.14 <br />X 09292010 <br />EQUIPMENT <br />SUBUR 3AT 4X4- Phoenix <br />2 <br />$3.68 <br />,"09292010 <br />LABOR <br />Engineering Assistant <br />2 <br />$29.44 <br />09292010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />846.28 <br />09202010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4- Phoenix <br />1.5 <br />$2.76 <br />� - w30/2010 <br />LABOR <br />Engineering Assistant <br />1.5 <br />525.76 <br />0913012010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />523.14 <br />*1302010 <br />LABOR <br />Engineering Technician 2 <br />0.5 <br />$17.36 <br />IO4112010 <br />EQUIPMENT <br />SUBUR 3AT 4X4- Phoenix <br />1 <br />$1.94 <br />, 10/012010 <br />LABOR <br />Engineering Assistant <br />1 <br />$14.72 <br />4 1010112010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />523.14 <br />10/042010 <br />EQUIPMENT <br />I TON PASSENGER VAN <br />3.5 <br />26.44 <br />10/042010 <br />LABOR <br />Engineering Technician 2 <br />3.5 <br />599.23 <br />10/052010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4- Phoanix <br />I <br />51.84 <br />Overhead Transaction Remark <br />$19.55 <br />STANDBY <br />530.73 <br />CONCRETE WAS LATE <br />519.55 <br />CONCRETE TRUCK ARRIVED LATE <br />530.73 <br />WRONG (FORMATION FOR LOCATOIN <br />S19.55 <br />CONCRETE TRUCK ARRIVED LATE <br />530.73 <br />WRONG IFORMATION FOR LOCATOIN <br />S 150.54 <br />S 269.94 <br />Overhead Transaction Remark <br />$39.09 <br />CONCRETE TESTING <br />S9.77 <br />CYL BREAKS <br />539.09 <br />CONCRETE TESTING <br />$9.77 <br />CYLINDER BREAKS , <br />561 AS <br />CONCRETE TESTING <br />59.77 <br />CYLINDER BREAKS 1. <br />561.45 <br />CONCRETE TESTING <br />$39.09 <br />PCC TESTING <br />530.73 <br />CONCRETE TESTING <br />539.09 <br />PCC TESTING <br />$61 AS <br />CONCRETE TESTING <br />53410 <br />PCC TESTING <br />S30.73 <br />CONCRETE TESTING <br />523.05 <br />CONCRETE TESTING/OT <br />$19.55 <br />PCC TESTING <br />$30.73 <br />CONCRETE TESTING <br />5131.76 <br />TWO PCC POURS ON CREST OAS OT <br />
The URL can be used to link to this page
Your browser does not support the video tag.