r~ <br />Lane County <br />Report to LBILL0O1 BILLABLE PROJECT COSTS Page No 2 <br />Run Date 11222010 <br />R= T= 12.34.57 <br />Billable Project Casa for Fiscal Period 2010-10 Period begins 10/012010 and ends including 10/312010 <br />Project: 36644029PBM W. 18th Ave (4584) Overhnd Rates Applied for this project: Federal (Where applinble) <br />10/012010 LABOR Engineering Assistant 1 $14.72 $1955 SAMPLE PICKUP <br />P4091 To" f 31.33 $ 39.10 5 70AS <br />3636213 Materials Tessin Total 2613.04 <br />36644029 Proiect Grand Total 2613.04 <br />