PIP .� <br />EcturpM�Nrr ::: <br />Hourly Total Equipment <br />Enuimmpnt Tvne Rate x Hnuro = Charon a ...: «e .. r%-- - ---I -- <br />1534008 1 62.40 1 1 2.00 1 1 124.80 1 <br />74.23 <br />0.00 <br />0 <br />99.03 <br />MA 1 tK1AL I U 1 AL: <br />Form <br />Billing Worksheet - Traffic <br />1 NYOiC9:10` AL <br />Labor <br />Material Type <br />Actual <br />Cost <br />x <br />Numberof <br />Units <br />+ <br />Overhead <br />10% <br />= <br />Material <br />Charge <br />Charges <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />MA 1 tK1AL I U 1 AL: <br />Form <br />Billing Worksheet - Traffic <br />1 NYOiC9:10` AL <br />Labor <br />.Charges <br />$228.27 <br />Equipment <br />Charges <br />$199.03 <br />Material <br />Charges <br />$0.00 <br />1 $0.001 TOTAL: 1 $427.30 <br />Document No. 578 <br />Page 1 of 1 Last Revised: 7/17/08 <br />Accounts Receivable Worksheet <br />