Run Date: 12/08/2010 10:45:42
<br />Contractor: MOWAT CONSTRUCTION CO.
<br />Job 93-004378
<br />Contract No: 2010-00003
<br />PO 2010100057
<br />Assessable: No
<br />City of Eugene
<br />Contract Preliminary Progress Payment
<br />Payment No : 016
<br />Original Contract: $3,438,410.50
<br />Current Amount: $3,845,273.03
<br />Contract Award Date: 07/27/2009
<br />Completion Date: 08/31/2010
<br />Line Description Last Chng Or Current Contract
<br />d Unit Price Unit Measure Quantity
<br />Estimated Payment Cumulative Totals
<br />Amount Quantity Amount Quantity
<br />Page 3
<br />Complete
<br />0220
<br />WORK CONTAINMENT PLAN AND SYST
<br />$2,000.00
<br />LUMPSUM
<br />1.000
<br />$2,000.00
<br />0.000
<br />$0.00
<br />1.000
<br />$2,000.00
<br />100.00
<br />0230
<br />REMOVAL OF PIPES
<br />$10.00
<br />FOOT
<br />60.000
<br />$600.00
<br />0.000
<br />$0.00
<br />60.000
<br />$600.00
<br />100.00
<br />0240
<br />REMOVAL OF CURBS
<br />$5.00
<br />FOOT
<br />173.000
<br />$865.00
<br />0.000
<br />$0.00
<br />152.500
<br />$762.50
<br />88.00
<br />0250
<br />REMOVAL OF WALKS AND DRIVEWAYS
<br />$15.00
<br />SQYD
<br />35.000
<br />$525.00
<br />0.000
<br />$0.00
<br />75.000
<br />$1,125.00
<br />214.00
<br />0260
<br />REMOVAL OF SURFACINGS
<br />$15.00
<br />SQYD
<br />15.000
<br />$225.00
<br />18.600
<br />$279.00
<br />31.040
<br />$465.60
<br />.207.00
<br />0270
<br />REMOVAL OF INLETS
<br />$500.00
<br />EACH
<br />3.000
<br />$1,500.00
<br />0.000
<br />$0.00
<br />3.000
<br />$1,500.00
<br />100.00
<br />0280
<br />REMOVAL OF GUARDRAIL
<br />$5.00
<br />FT
<br />64.000
<br />$320.00
<br />0.000
<br />$0.00
<br />64.000
<br />$320.00
<br />100.00
<br />0290
<br />ASPHALT PAVEMENT SAW CUTTING
<br />$3.00
<br />FT
<br />174.000
<br />$522.00
<br />46.000
<br />$138.00
<br />172.000
<br />$516.00
<br />99.00
<br />0300
<br />CLEARING AND GRUBBING
<br />$10,000.00
<br />LUMPSUM
<br />1.000
<br />$10,000.00
<br />0.000
<br />$0.00
<br />1.000
<br />$10,000.00
<br />100.00
<br />0310
<br />DITCH EXCAVATION
<br />$20.00
<br />CUYD
<br />100.000
<br />$2,000.00
<br />0.000
<br />$0.00
<br />100.000
<br />$2,000.00
<br />100.00
<br />0320
<br />EMBANKMENT IN PLACE
<br />$25.00
<br />CUYD
<br />220.000
<br />$5,500.00
<br />0.000
<br />$0.00
<br />30.000
<br />$750.00
<br />14.00
<br />0330
<br />RIPRAP GEOTEXTILE, TYPE 2
<br />$4.00
<br />SQYD
<br />50.000
<br />$200.00
<br />24.400
<br />$97.60
<br />91.400
<br />$365.60
<br />163.00
<br />0340
<br />LOOSE RIPRAP, CLASS 50
<br />$60.00
<br />CUYD
<br />14.000
<br />$840.00
<br />10.010
<br />$600.60
<br />30.030
<br />$1,801.80
<br />215.00
<br />0350
<br />RIPRAP CHECK DAMS
<br />$300.00
<br />EACH
<br />4.000
<br />$1,200.00
<br />0.000
<br />$0.00
<br />5.000
<br />$1,500.00
<br />125.00
<br />0360
<br />12 INCH STORM SEWER PIPE, 5 FT
<br />$65.00
<br />FOOT
<br />186.000
<br />$12,090.00
<br />0.000
<br />$0.00
<br />190.000
<br />$12,350.00
<br />102.00
<br />0370
<br />CONCRETE INLETS, TYPE CG-3
<br />$1,850.00
<br />EACH
<br />1.000
<br />$1,850.00
<br />0.000
<br />$0.00
<br />1.000
<br />$1,850.00
<br />100.00
<br />0380
<br />CATCH BASINS, CONCRETE
<br />$1,500.00
<br />EACH
<br />9.000
<br />$13,500.00
<br />0.000
<br />$0.00
<br />9.000
<br />$13,500.00
<br />100.00
<br />0390
<br />DRAINAGE CURBS
<br />$28.00
<br />FOOT
<br />52.000
<br />$1,456.00
<br />79.000
<br />$2,212.00
<br />79.000
<br />$2,212.00
<br />152.00
<br />0400
<br />CONNECTION TO EXISTING STRUCTU
<br />$500.00
<br />EACH
<br />3.000
<br />$1,500.00
<br />0.000
<br />$0.00
<br />3.000
<br />$1,500.00
<br />100.00
<br />0410
<br />MINOR ADJUSTMENT OF MANHOLES
<br />$500.00
<br />EACH
<br />1.000
<br />$500.00
<br />1.000
<br />$500.00
<br />2.000
<br />$1,000.00
<br />200.00
<br />0420
<br />SHORING, CRIBBING AND COFFERDA
<br />$6,000.00
<br />LUMPSUM
<br />1.000
<br />$6,000.00
<br />0.000
<br />$0.00
<br />1.000
<br />$6,000.00
<br />100.00
<br />0430
<br />STRUCTURE EXCAVATION
<br />$1,000.00
<br />LUMPSUM
<br />1.000
<br />$1,000.00
<br />0.000
<br />$0.00
<br />1.000
<br />$1,000.00
<br />100.00
<br />0440
<br />GRANULAR STRUCTURE BACKFILL
<br />$800.00
<br />LUMPSUM
<br />1.000
<br />$800.00
<br />0.000
<br />$0.00
<br />1.000
<br />$800.00
<br />100.00
<br />0450
<br />FURNISH DRILLING EQUIPMENT
<br />$50,000.00
<br />LUMPSUM
<br />1.000
<br />$50,000.00
<br />0.000
<br />$0.00
<br />1.000
<br />$50,000.00
<br />100.00
<br />Amount