Run Date: 12/07/2010 09:48:41 <br />Contractor: WILDISH CONSTRUCTION <br />Job 93-004657 <br />Contract No: 2010-00015 <br />PO 2010100238 <br />Assessable: No <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 004 <br />Original Contract: $792,819.50 <br />Current Amount: $796,741.36 <br />Contract Award Date: 03/19/2010 <br />Completion Date: 09/03/2010 <br />Current Contract <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity <br />Page 4 <br />% Complete <br />0370 <br />MINOR ADJUSTMENT OF MANHOLES <br />002 <br />$1,250.00 <br />EACH <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0371 <br />MINOR ADJ MANHOLES, METHOD 13-J <br />002 <br />$1,100.00 <br />EACH <br />34.000 <br />$37,400.00 <br />0.000 <br />$0.00 <br />34.000 <br />$37,400.00 <br />100.00 <br />0380 <br />REM/REPL FRAME/COVER-ST <br />$275.00 <br />EACH <br />20.000 <br />$5,500.00 <br />0.000 <br />$0.00 <br />22.000 <br />$6,050.00 <br />110.00 <br />0390 <br />REM/REPL FRAME/COVER-WW <br />$275.00 <br />EACH <br />9.000 <br />$2,475.00 <br />0.000 <br />$0.00 <br />10.000 <br />$2,750.00 <br />111.00 <br />0400 <br />COLD PLANE PVMT REMOVAL, 3" DE <br />$0.28 <br />SQFT <br />194,700.000 <br />$54,516.00 <br />0.000 <br />$0.00 <br />185,811.900 <br />$52,027.33 <br />95.00 <br />0410 <br />LEVEL 3, 1/2" DENSE WMAC <br />$47.00 <br />TON <br />4,300.000 <br />$202,100.00 <br />0.000 <br />$0.00 <br />3,868.760 <br />$181,831.72 M <br />90.00 <br />0420 <br />ASPHALT CONCRETE PAVEMENT REPA <br />$60.00 <br />CUYD <br />240.000 <br />$14,400.00 <br />0.000 <br />$0.00 <br />254.400 <br />$15,264.00 <br />106.00 <br />0421 <br />ADDITIONAL PAVEMENT REPAIR (JO <br />003 <br />$250.14 <br />LUMPSUM <br />1.000 <br />$250.14 <br />1.000 <br />$250.14 <br />1.000 <br />$250.14 <br />100.00 <br />0430 <br />STANDARD CONCRETE CURBS <br />$27.00 <br />FOOT <br />100.000 <br />$2,700.00 <br />0.000 <br />$0.00 <br />94.400 <br />$2,548.80 <br />94.00 <br />0440 <br />CONCRETE CURB AND GUTTER <br />$29.00 <br />FOOT <br />90.000 <br />$2,610.00 <br />0.000 <br />$0.00 <br />83.500 <br />$2,421.50 <br />93.00 <br />0450 <br />CONCRETE WALKS, 4" THICK <br />$7.00 <br />SQFT <br />1,655.000 <br />$11,585.00 <br />0.000 <br />$0.00 <br />1,431.300 <br />$10,019.10 <br />86.00 <br />0460 <br />TRUNCATED DOME TEXTURING-BLACK <br />$20.00 <br />SQFT <br />104.000 <br />$2,080.00 <br />0.000 <br />$0.00 <br />101.600 <br />$2,032.00 <br />98.00 <br />0470 <br />ALTERATION OF CONCRETE SIGNAL <br />$200.00 <br />EACH <br />2.000 <br />$400.00 <br />0.000 <br />$0.00 <br />1.000 <br />$200.00 <br />50.00 <br />0471 <br />LOWER EXISTING ABANDONED SIGNA <br />001 <br />$100.89 <br />LUMPSUM <br />1.000 <br />$100.89 <br />0.000 <br />$0.00 <br />1.000 <br />$100.89 <br />100.00 <br />0480 <br />REMOVE/REPLACE BRICK WALK <br />$35.00 <br />SQFT <br />16.000 <br />$560.00 <br />0.000 <br />$0.00 <br />26.100 <br />$913.50 <br />163.00 <br />0481 <br />REM SECTION OF TRAFFIC ISLAND <br />001 <br />$131.68 <br />LUMPSUM <br />1.000 <br />$131.68 <br />0.000 <br />$0.00 <br />1.000 <br />$131.68 <br />100.00 <br />0482 <br />REPLACE TRAFFIC ISLAND (JOB #4 <br />003 <br />$1,312.68 <br />LUMPSUM <br />1.000 <br />$1,312.68 <br />1.000 <br />$1,312.68 <br />1.000 <br />$1,312.68 <br />100.00 <br />0490 <br />PVMT LEGEND, TYPE B: ARROWS <br />$235.00 <br />EACH <br />49.000 <br />$11,515.00 <br />0.000 <br />$0.00 <br />46.000 <br />$10,810.00 <br />94.00 <br />0500 <br />PVMT LEGEND, TYPE B: BICYCLE L <br />$265.00 <br />EACH <br />12.000 <br />$3,180.00 <br />0.000 <br />$0.00 <br />12.000 <br />$3,180.00 <br />100.00 <br />0510 <br />PVMT LINE, TYPE B: PARKING TEE <br />$44.00 <br />SQFT <br />85.000 <br />$3,740.00 <br />0.000 <br />$0.00 <br />86.700 <br />$3,814.80 <br />102.00 <br />0520 <br />PVMT LINE, TYPE B <br />$7.00 <br />SQFT <br />2,090.000 <br />$14,630.00 <br />0.000 <br />$0.00 <br />1,590.500 <br />$11,133.50 <br />76.00 <br />0521 <br />REM TYPE B CROSSWALK BARS-JOB <br />002 <br />$810.00 <br />LUMPSUM <br />1.000 <br />$810.00 <br />0.000 <br />$0.00 <br />1.000 <br />$810.00 <br />100.00 <br />0530 <br />MONO-DIRECTIONAL CRYSTAL TYPE <br />$5.00 <br />EACH <br />169.000 <br />$845.00 <br />0.000 <br />$0.00 <br />156.000 <br />$780.00 <br />92.00 <br />0540 <br />BI-DIRECTIONAL YELLOW TYPE I M <br />$5.00 <br />EACH <br />7.000 <br />$35.00 <br />0.000 <br />$0.00 <br />23.000 <br />$115.00 <br />329.00 <br />Amount <br />