New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2002-03108 Contract
COE
>
PW
>
POS_PWM
>
Contracts
>
2011 Contracts scanned to Verify
>
2002-03108 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2011 8:36:55 AM
Creation date
12/6/2010 12:42:44 PM
Metadata
Fields
Template:
PW_Contract
COE_Contract_Number
2002-03108
PW_Document_Type_Contract
AP/AR Invoices
Organization
Lane Transit District Bus Rapid Transit IGA
PW_Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Yeiter/Larsen
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Execution <br />H. Technical Level Coordination. <br />The parties anticipate that discussion of the Project at the design and technical level will occur <br />primarily through the currently established Technical Advisory Committee (TAC) and the BRT Policy Team. <br />LTD will provide administrative services for the TAC and BRT Policy Team. The staff membership on the <br />TAC can be adjusted to accommodate participation by the most appropriate staff at various stages of the <br />design process. In addition, subcommittees of the TAC shall be established, as needed, to deal with specific <br />design issues or to address issues that are specific to a particular jurisdiction. <br />LTD will confer and consult with the TAC on such design details as it finds necessary during <br />construction and on any changes affecting those design issues for which City has the primary concern, as <br />described in Subpart H.C. <br />L Design Changes to Project. <br />LTD and the City anticipate that there will be design changes to the Project as final design work <br />progresses prior to construction. Significant Design Changes will require review and approval by the City <br />Planning Commission. Once construction begins, all design changes that require a change order or affect <br />those design issues for which the City has primary concern, as described in Subpart II.C, will be referred to <br />the City's Project Manager. <br />.I. Dispute Resolution. <br />The parties will endeavor to promptly reach consensus on all design issues during the design phase <br />so as not to delay the construction or increase the cost of the Project. To avoid delay, design review will <br />occur at the TAC level at the earliest possible date. To the extent that the TAC is unable to reach consensus <br />on a Project design issue, the issue will be forwarded by the TAC to the BRT Policy Team for resolution. <br />III. CONSTRUCTION OF PROJECT <br />A. Construction Method. <br />Construction of the Project will be by either the more traditional "design, bid, build" method, or, by <br />a "construction management/general contractor" (CMGC) approach in which the General Contractor of the <br />CMGC has the chance to participate in project design. The decision on the approach to use will be made by <br />the LTD Board of Directors, with advice from the TAC. <br />B. Selection of the Contractor. <br />The LTD Board shall select the contractor. <br />C. Partnering. <br />A partnering process, that includes key design consultants, the contractor, LTD, the City, the City <br />of Springfield, Lane County, and ODOT, will be held soon after the contractor is hired. A consultant that <br />specializes in construction project partnering will be hired by LTD to manage the process <br />Eugene - LTD IGA for Bus Rapid Transit Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.