New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2001-00312 Contract
COE
>
PW
>
POS_PWM
>
Contracts
>
2011 Contracts scanned to Verify
>
2001-00312 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2011 11:15:33 AM
Creation date
12/6/2010 8:57:51 AM
Metadata
Fields
Template:
PW_Contract
COE_Contract_Number
2001-00312
PW_Document_Type_Contract
Contract
Organization
LTD
PW_Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Dale, Randal
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />City of Eugene <br />Contract 00312 <br />LANE TRANSIT DISTRICT/CITY OF EUGENE PUBLIC WORKS <br />DEPARTMENT <br />BUS STOP/SHELTER LIGHTING AGREEMENT <br />BETWEEN: Lane Transit District, hereinafter referred to as LTD <br />AND City of Eugene Public Works Department, hereinafter <br />referred as PWD <br />RECITALS <br />PWD owns property on which LTD bus stops and passenger <br />waiting shelters are placed. <br />2. LTD and PWD mutually agree to the acquisition of power for <br />illuminating bus stops and/or passenger waiting shelters <br />throughout the City of Eugene by wiring connections to existing <br />street light circuits according to the terms set forth below and in <br />any additional exhibits attached hereto. <br />AGREEMENT <br />TERM. This agreement shall be continuous until terminated by <br />mutual agreement or by either party giving at least thirty (30) days' <br />advance notice to the other party. <br />2. INSTALLATION. The installation of passenger waiting shelters at <br />any site is covered by an existing, blanket revocable permit issued <br />by the City of Eugene, Permit & Information Department. The work <br />will include the excavation for placement of PVC conduit and wiring <br />underground from the point of connection at PWD street light circuits <br />to the passenger shelters and backfill and restoration of the surface <br />areas to their prior conditions. In most cases, the points of <br />connection will be at existing street light junction boxes. Future <br />installations also may include the installation of additional street <br />lights by PWD, at LTD expense, to accommodate shelter locations <br />where street lighting circuitry is not currently available. Prior to <br />installation at any designated site, LTD will submit the site <br />installation details to PWD for review and approval. <br />3. INSTALLATION COSTS. All materials and labor required to make <br />the necessary wiring installations between PWD street light circuits <br />and LTD passenger shelters will be provided and paid for by LTD. <br />i <br />Lane Transit District <br />P. 0. Box 7070 <br />Eugene, OR 97401-0470 <br />Phone: 541-682-6i <br />Fax., 541-682-61111 <br />TTY 800-7352900 <br />E-mail. Itd0td.lane.orus <br />lntemet.• www.ltd.'org <br />
The URL can be used to link to this page
Your browser does not support the video tag.