WEISS Cela M <br />From: OAKES Jeanne M <br />Sent: Monday, August 13, 2007 4:48 PM <br />To: WEISS Cela M; GALLUP Steve S; STUBBS Sandra G; SMITH Tammy D; CLARK Debbie D <br />Subject: Contracts Transferring to PWM w/Steve Gallup <br />I'm late, I'm late. Steve Gallup has already transferred out to PWM, and here comes the following contracts <br />(operating funds only and permanent railroad easements) in the pony to you Cela. Please note that a requisition <br />needs to be done yet for the 2008 contract, otherwise, everything should be already done. Sorry this hasn't come <br />to you before this. <br />2008-00201 w/OBEC: Pedestrian Bridge Inspections (38) <br />1996-00218 w/Southern Pacific Lines: permanent easement at Riverfront Parkway <br />1997-00301 w/Union Pacific Railroad: easement for construction/maintenance of widened Ferry Street Bridge <br />viaduct <br />Jeanne Oakes <br />Public Works-Engineering <br />541.682.5257 <br />SEP 0 4 2007 ffkxtaal~ <br />.7 <br />