Final Acceptance <br />Public Works <br />Completion of Warranty Period Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Egge Sand & Gravel <br />Mike Broadsword <br />PO Box 1067 <br />Eugene OR 97440 <br />Project: 2009 Pothole Repair Project <br />Contract Number: 2009-28 <br />Date: November 18, 2010 <br />From: Glen A.. Fee <br />Job Number: 4624 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Q:\PROJECTS\PROJ-4\4624\Correspondence\Contractors\4624 20101118 Final Acceptance Completion of Warranty Period.doc Nib <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects iz- <br />