4 �Bt1G1tIlE <br />.,:- a`�. <br />Public Works <br />Maintenance Division <br />City of Eugene <br />1820 Roosevelt Blvd. <br />MEMORANDUM Eugene, Oregon 97402 <br />(541) 682 -4800 <br />(541) 682 -4882 FAX <br />p � wvvw.eugene- or.gov <br />Date: November 17, 2010 �� J�L <br />To: Tom Larsen, City Traffic Engineer <br />From: Steve Gallup, Traffic Technical Supervisor <br />Subject: IGA #27093 - Franklin Blvd. Traffic Signal Controller Upgrades <br />Attached is the Intergovernmental Agreement (IGA) between the City of Eugene and the State of <br />Oregon to upgrade 12 traffic signal controllers using Oregon state - approved signal software <br />within the Franklin corridor. The Project is part of the Transportation, Community, and System <br />Preservation Program (TCSP) administered by FHWA. <br />Total project cost is estimated at $45,000. TCSP funds are limited to $40,375, with the City <br />providing the match amount of $4,625 that will be paid from the Traffic Signal Maintenance <br />Road fund. <br />Page I of I <br />