.^" Public Works <br />PROJECT AUTHORIZATION FORM ldailftd "M <br />Bark4b Op 5pacsOMSiona <br />Ody91EU0ana <br />18208 Saved Blvd <br />E."" Ora0an 97402 <br />(241 }682-800 <br />(5411682- 4882F" <br />EldEll &OI n4a <br />Service ID: 1 J O C'� SID PB _ GL JC _ JE <br />Project Title: Skinner Butte Trail Rehab <br />(location and work description) <br />Project Manager /Contact /Private Engineer: Eric Wold <br />ECT SCOPE: <br />g: <br />Bike lanes /paths: <br />(widths) <br />(width)I <br />rete walks <br />Se[back /CUrbsitle <br />ewater <br />Stormwater <br />Landscaping j <br />I <br />Street lights <br />Row required <br />building construction <br />Planning, Other <br />Remodel <br />FUNDING SOURCES: <br />City A6 Assessments Private Other Departmen <br />Account Code 311 - 9335 -9xxxx (funding will come from A6 committee priorities on generic A6 acct <br />Fed /State /Count /FAA ( % ,FI %ED) <br />COMMENTS /SPECIAL PROJECT INFO. /INTERDEPARTMENTAL WORK DESCRIPTION: <br />This will focus on rehabilitation work on the Skinner Butte Trail. This project will be prioritized funding from the <br />annual A6 allocation, by the A6 committee, dependent upon the need for trail rehabilitation in this area. <br />APPROVED: <br />Project Manager: Date: <br />Section Manager: Date: — (� <br />Financial Analyst: Date: / <br />Division Manager: Date: 2 012D <br />FOR USE BY ADMINISTRATION ONLY <br />Capital Project No. ACK <br />GL Title <br />Assigned by: Date: <br />Accounting by: Date: <br />ATTACHMENTS: <br />PWM /POS 100 Revised: Aug 2010 <br />