CITY OF EUGENE
<br />DEPARTMENT OF PUBLIC WORKS
<br />ENGINEERING DIVISION
<br />Change Order
<br />CONTRACTOR. 20 Inn tlba 2G C.h m.lon
<br />(ADDRESS) POS.11735
<br />Eugene, Orenon 97440
<br />PROJECT Bond Lane Park Phegroted Renovation located at 1295 Bond Lane
<br />(Job #4601) Is Street Park Playground Renovation located at
<br />2130 Dakota Street (Job #4621)
<br />You are directed to make the following changes In this contract
<br />c,.s...,.r rnn4mn
<br />Job#
<br />460184621
<br />Convacl#
<br />Change Oder#
<br />Dale
<br />2010-00027
<br />1
<br />06124110
<br />CAMS Date
<br />Reviev ed by
<br />Data
<br />Inspector
<br />Amended
<br />Change
<br />PIA
<br />S Milovich
<br />Prot Mgr
<br />A Steffan
<br />Principal Eng
<br />M AJIF
<br />M Cahill 1 44 oC
<br />Item
<br />No. hem
<br />Time
<br />Chan ga
<br />Net change by previous change order ,_. _ .__ ............. . _.... ........... .... ..,._......__.._
<br />Quantity
<br />Units
<br />Unit
<br />Cost
<br />Amount 1 (+/-) l
<br />The contract sum prior to this change order was .__ ___,.,,,,,,, ___ _ ,,..,_._,__.... ...- ..._ ............. .
<br />Amended
<br />Change
<br />Net
<br />Change
<br />280
<br />State Street - Delete S' PVC Storm
<br />Drain Pipe (Job #4621)
<br />D
<br />l
<br />90.00 FT
<br />36.51
<br />295.90
<br />Percentage of original contract ..........._..... _...
<br />0.00
<br />...... ......._............ -. _.._.......... -. ---
<br />NEr CHANGE DUE TO AMENDMENTS I
<br />d
<br />O.DO
<br />.00
<br />.OD
<br />d
<br />0.00
<br />00
<br />.DO
<br />290
<br />State Sbeet - Delete 8 - S%nn Drain
<br />Connection Conneon (Job #4621)
<br />0
<br />l
<br />IM LS
<br />1311.00
<br />1311.00
<br />0.00
<br />($1,311.00)
<br />d
<br />D.00
<br />.00
<br />.00
<br />tAGended
<br />d
<br />D.00
<br />$0.00
<br />.W
<br />320
<br />State Street � Delete Re§amt Pads
<br />(301, #4621)
<br />0
<br />l
<br />6.00 EACH
<br />S.0D
<br />3 630.00
<br />$0.00
<br />($3,630.00)
<br />d
<br />0.00
<br />0.00
<br />0.00
<br />ed
<br />0.00
<br />0.00
<br />$D.00
<br />3110
<br />State Street - Delete Fen. (Job #4621)
<br />'
<br />0
<br />al
<br />162 SD LF
<br />40.01
<br />6 481.62
<br />0.00
<br />($6,481.62)
<br />d
<br />0.00
<br />$0.00
<br />000
<br />1 Amended
<br />0.00
<br />D.00
<br />$0.00
<br />410
<br />State Street- Delete Stepping Stand
<br />Pavers (Job #4621)
<br />0
<br />original
<br />IAO LS
<br />Salim
<br />91100
<br />0 DO
<br />W11.00)
<br />Revised
<br />000
<br />Saw
<br />$0.00
<br />Amended
<br />0.00
<br />$0.00
<br />Slim
<br />420
<br />State Street - Delete Shrubs, 19 -24
<br />(Job #4621)
<br />0
<br />On Inal
<br />11.00 EACH
<br />$32.10
<br />$353.10
<br />$0.00
<br />($353.10)
<br />Revised
<br />600
<br />$0.00
<br />$0.00
<br />Amended
<br />0.00
<br />$0.00
<br />$0.00
<br />430
<br />State Street - Delete Shubs, 2 gallon
<br />(Job #4621)
<br />0
<br />06 00".1
<br />36.00 EACH
<br />$21.Q
<br />$770.40
<br />$0.00
<br />($770.40)
<br />Revised
<br />0.00
<br />$0.00
<br />$0.00
<br />Amended
<br />0.00
<br />$0.00
<br />$0.00
<br />The original contract work days we 00 da a
<br />The con[rect time change this C.O 00 da a
<br />Tha crontraU time change by previous C O's 0.0 days
<br />Tha new contract work days are D o days
<br />The original contract sum was __........_- .......... ..... ........_....... ..........
<br />$119 , 640,40
<br />Net change by previous change order ,_. _ .__ ............. . _.... ........... .... ..,._......__.._
<br />$0.00
<br />Net change due to amendment by previous change order -------- -- - - -- -_ -------
<br />$0.00
<br />The contract sum prior to this change order was .__ ___,.,,,,,,, ___ _ ,,..,_._,__.... ...- ..._ ............. .
<br />$119,640.40
<br />This change order will change contract sum by this amount ----- ,,,,, ,,,,, , ,, , , ,,,,_,,,.,_.,,,,, _. ,_ .. _....
<br />J$16,643.021
<br />The new contract net change sum ._......... .__ ............... . . . .. ......... . .. ..
<br />($1664302)
<br />The new contract amendment sum ......... ... .. ........... .....- ....... ......
<br />$
<br />order will -' - - -. _ .... 1...........
<br />The new contrail sum including this change order will be , _. _-- _,__ „�, ---
<br />$1 02,997.38
<br />Percentage of original contract ..........._..... _...
<br />- 13,91%
<br />...... ......._............ -. _.._.......... -. ---
<br />NEr CHANGE DUE TO AMENDMENTS I
<br />D.DD%
<br />Approval by ,i
<br />City Engineer Prime Contractor Third Party
<br />Date Date Date
<br />❑ CONTRACTOR ❑ OFFICE FILE ❑ PURCHASINGICRO
<br />O'TROJECTS \PROJ.l 6BOl COnatructlon%Change OrdemWC0164621- ChangoOderi.xb
<br />This changes the bid items as follows.
<br />
|