CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR. 20 Inn tlba 2G C.h m.lon <br />(ADDRESS) POS.11735 <br />Eugene, Orenon 97440 <br />PROJECT Bond Lane Park Phegroted Renovation located at 1295 Bond Lane <br />(Job #4601) Is Street Park Playground Renovation located at <br />2130 Dakota Street (Job #4621) <br />You are directed to make the following changes In this contract <br />c,.s...,.r rnn4mn <br />Job# <br />460184621 <br />Convacl# <br />Change Oder# <br />Dale <br />2010-00027 <br />1 <br />06124110 <br />CAMS Date <br />Reviev ed by <br />Data <br />Inspector <br />Amended <br />Change <br />PIA <br />S Milovich <br />Prot Mgr <br />A Steffan <br />Principal Eng <br />M AJIF <br />M Cahill 1 44 oC <br />Item <br />No. hem <br />Time <br />Chan ga <br />Net change by previous change order ,_. _ .__ ............. . _.... ........... .... ..,._......__.._ <br />Quantity <br />Units <br />Unit <br />Cost <br />Amount 1 (+/-) l <br />The contract sum prior to this change order was .__ ___,.,,,,,,, ___ _ ,,..,_._,__.... ...- ..._ ............. . <br />Amended <br />Change <br />Net <br />Change <br />280 <br />State Street - Delete S' PVC Storm <br />Drain Pipe (Job #4621) <br />D <br />l <br />90.00 FT <br />36.51 <br />295.90 <br />Percentage of original contract ..........._..... _... <br />0.00 <br />...... ......._............ -. _.._.......... -. --- <br />NEr CHANGE DUE TO AMENDMENTS I <br />d <br />O.DO <br />.00 <br />.OD <br />d <br />0.00 <br />00 <br />.DO <br />290 <br />State Sbeet - Delete 8 - S%nn Drain <br />Connection Conneon (Job #4621) <br />0 <br />l <br />IM LS <br />1311.00 <br />1311.00 <br />0.00 <br />($1,311.00) <br />d <br />D.00 <br />.00 <br />.00 <br />tAGended <br />d <br />D.00 <br />$0.00 <br />.W <br />320 <br />State Street � Delete Re§amt Pads <br />(301, #4621) <br />0 <br />l <br />6.00 EACH <br />S.0D <br />3 630.00 <br />$0.00 <br />($3,630.00) <br />d <br />0.00 <br />0.00 <br />0.00 <br />ed <br />0.00 <br />0.00 <br />$D.00 <br />3110 <br />State Street - Delete Fen. (Job #4621) <br />' <br />0 <br />al <br />162 SD LF <br />40.01 <br />6 481.62 <br />0.00 <br />($6,481.62) <br />d <br />0.00 <br />$0.00 <br />000 <br />1 Amended <br />0.00 <br />D.00 <br />$0.00 <br />410 <br />State Street- Delete Stepping Stand <br />Pavers (Job #4621) <br />0 <br />original <br />IAO LS <br />Salim <br />91100 <br />0 DO <br />W11.00) <br />Revised <br />000 <br />Saw <br />$0.00 <br />Amended <br />0.00 <br />$0.00 <br />Slim <br />420 <br />State Street - Delete Shrubs, 19 -24 <br />(Job #4621) <br />0 <br />On Inal <br />11.00 EACH <br />$32.10 <br />$353.10 <br />$0.00 <br />($353.10) <br />Revised <br />600 <br />$0.00 <br />$0.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />430 <br />State Street - Delete Shubs, 2 gallon <br />(Job #4621) <br />0 <br />06 00".1 <br />36.00 EACH <br />$21.Q <br />$770.40 <br />$0.00 <br />($770.40) <br />Revised <br />0.00 <br />$0.00 <br />$0.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />The original contract work days we 00 da a <br />The con[rect time change this C.O 00 da a <br />Tha crontraU time change by previous C O's 0.0 days <br />Tha new contract work days are D o days <br />The original contract sum was __........_- .......... ..... ........_....... .......... <br />$119 , 640,40 <br />Net change by previous change order ,_. _ .__ ............. . _.... ........... .... ..,._......__.._ <br />$0.00 <br />Net change due to amendment by previous change order -------- -- - - -- -_ ------- <br />$0.00 <br />The contract sum prior to this change order was .__ ___,.,,,,,,, ___ _ ,,..,_._,__.... ...- ..._ ............. . <br />$119,640.40 <br />This change order will change contract sum by this amount ----- ,,,,, ,,,,, , ,, , , ,,,,_,,,.,_.,,,,, _. ,_ .. _.... <br />J$16,643.021 <br />The new contract net change sum ._......... .__ ............... . . . .. ......... . .. .. <br />($1664302) <br />The new contract amendment sum ......... ... .. ........... .....- ....... ...... <br />$ <br />order will -' - - -. _ .... 1........... <br />The new contrail sum including this change order will be , _. _-- _,__ „�, --- <br />$1 02,997.38 <br />Percentage of original contract ..........._..... _... <br />- 13,91% <br />...... ......._............ -. _.._.......... -. --- <br />NEr CHANGE DUE TO AMENDMENTS I <br />D.DD% <br />Approval by ,i <br />City Engineer Prime Contractor Third Party <br />Date Date Date <br />❑ CONTRACTOR ❑ OFFICE FILE ❑ PURCHASINGICRO <br />O'TROJECTS \PROJ.l 6BOl COnatructlon%Change OrdemWC0164621- ChangoOderi.xb <br />This changes the bid items as follows. <br />